Edged Energy: Lisbon

Latest Podcast
Merlin Properties
Under Construction
New facility under construction
Operated by:

Edged Energy: Lisbon

Short Code: LIS01
Year Planned: 2027
PUE: 1.15
Utility Provider: E-REDES & REN

Real estate firm Merlin Properties and data center company Edged Energy has started construction of a new campus in Lisbon, Portugal. The campus will be constructed in phases with the first of five facilities expected to come online in 2027.

  • MERLIN Edged Lisbon AI Campus is officially designated OCP Ready™ for hyperscalers by the Open Compute Project Foundation!

Lisbon Campus Features:


  • Five buildings planned
  • New build; three stories, concrete slab, precast concrete structure; two loading dock bays
  • 24 x 7 x 365 access; 2 meet-me rooms
  • Multiple fiber providers; three diverse points of entry
  • Tier III design concurrently maintainable
  • 100% uptime SLA

Power:


  • Battery backup supporting all electrical and mechanical systems
  • UPS with N+1 redundancy
  • Generators with N+1 redundancy
  • Standby generation systems utilize Tier 4 Final engines which reduce NOx and particulate matter emissions by up to 99%
  • Redundant A+B side distribution
  • Revenue-grade, transparent, real-time metering

Map and Nearby Locations:

Merlin Properties
Edged Energy Sites
Nearby Facilities

Edged Energy: Lisbon Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Edged Energy: Lisbon

Distance Site About
0.09 miles Merlin: Lisbon
Real estate firm Merlin Properties and data center company Edged Energy has started construction of a new campus in Lisbon, Portugal. The campus will be constructed in phases with the first of five facilities expected to come online in 2027.
0.10 miles Edged Energy: LIS02
The facility is a part of Edged Energy's Lisbon Campus in Portugal.
0.15 miles Edged Energy: LIS03
The facility is a part of Edged Energy's Lisbon Campus in Portugal.
0.21 miles Edged Energy: LIS05
The facility is a part of Edged Energy's Lisbon Campus in Portugal.
0.28 miles Edged Energy: LIS04
The facility is a part of Edged Energy's Lisbon Campus in Portugal.
16.04 miles Voltekko: Alcochete
Voltekko Group is launching its first eco-responsible data center in Alcochete, Portugal. This purpose-built facility is slated to open in the third quarter of 2026.
16.39 miles Equinix Lisbon LS1
16.42 miles Equinix: LS2
This new facility offers 2,050 square meters (22,065 sq ft) of co-location space across three floors, with an initial capacity of 625 racks.
18.25 miles Oni: Matinha, Lisbon
18.62 miles FCCN Lisbon

Edged Energy: Lisbon Data Center Photos (See all)

Rendering of Edge Energy's Lisbon Campus in Portugal
Source: Edged Energy

Operating Company

Operated by:

Edged Energy is a colocation and data center provider. The company also has data centers in development across the US.

Its Spain business is a subsidiary of Endeavour in collaboration with Merlin Properties.

44
Facilities
23
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?