Colo Reseller Data CenterInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Murfreesboro, TN 37129, USA
Under ConstructionOperationalPlannedProspective Expansion
Fully operational facility with expansion in progress and future phases planned and prospective expansion planned
Operated by: Colo Reseller OperatorInterested in this information?Contact us

Colo Reseller Data Center

Short Code: MD1
Site was first built in 2016 and has expansions through 2028
PUE: 1.5
Utility Provider: Middle Tennessee Electric
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Total Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Data Suites Murfreesboro is a modular colocation facility located 35 miles outside of downtown Nashville. The distance is deliberate. The site is positioned for disaster recovery, and it was unaffected by the downtown Nashville bombing that disrupted most Middle Tennessee data centers.

The building is divided into eight suites that operate autonomously or together, so a tenant can take one suite or the whole floor. Across the suites the facility racks roughly 240 cabinets. Each suite can be leased as colocation down to a single rack unit, as white space, or as conventional office space on a triple-net lease.

Power is distributed at 415V direct to the server, a specification the building was designed around rather than retrofitted for. Cabinets are fed at 225 A and auto-transformed to 415 V, and the standard drop is a 415V / 63 A breaker. Direct 480V and direct 415V feeds are available in four-wire or five-wire configurations, and a whip can be run to a cabinet without a row PDU. Distribution runs on Schneider Electric modular breaker-and-whip hot-swap units, and additional conduit is being run to several modules so that feeds can be paralleled. Density is not capped by the distribution design: a single high-density rack can take an entire module.

Cooling is cold-aisle containment on three-foot aisles, served by in-row coolers at 415 V rated at roughly 40 kW each, with low-ambient kits available for cold-weather operation. Chillers are modular and dock and undock as capacity changes. Direct liquid cooling is supported for tenants that bring chip-cooled hardware, because the in-row manifold hookups accept a liquid distribution manifold on the same connections.

Connectivity was engineered at build rather than added later. The facility reaches Europe over 55 routes and runs diverse routes to Atlanta, Chicago, Dallas, and North and South Nashville. Dark fiber is present in the building, seven carriers are on site, and six of them are in the BGP product.

Map and Nearby Locations

This Facility
Colo Reseller OperatorInterested in this information?Contact us Sites
Nearby Facilities

Colo Reseller Data CenterInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by: Colo Reseller OperatorInterested in this information?Contact us
This operator's profile is available on request. Full company details, market presence, portfolio scale, and operating history are available to subscribers with unblurred access. Contact us to unlock the complete operator profile for this facility and every other location in their footprint.Interested in this information?Contact us
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read 25MW AI Data Center Planned for McMinnville
25MW AI Data Center Planned for McMinnville

25MW AI Data Center Planned for McMinnville

May 27, 2026 Tennessee

A new 25MW AI data center campus is planned for McMinnville in Warren County. Known as Hixson Data Center, the facility will span 96,065 square feet (8,925 square meters) across two levels and is being purpose-built for high-density AI workloads, including support for Nvidia’s GB200 NVL72...

Read more
Read Kairos gets construction permits for Hermes Two Demonstration Plant
Kairos gets construction permits for Hermes Two Demonstration Plant

Kairos gets construction permits for Hermes Two Demonstration Plant

November 26, 2024 Tennessee

The Nuclear Regulatory Commission (NRC) has issued construction permits to Kairos Power for its Hermes Two Demonstration Plant at the Heritage Center Industrial Park in Oak Ridge, Tennessee. The plant will also host a proposed single 35MW Hermes One Test Reactor, a non-nuclear engineering test...

Read more
Read Carter Funds acquires data center in Collierville, Tennessee
Carter Funds acquires data center in Collierville, Tennessee

Carter Funds acquires data center in Collierville, Tennessee

November 11, 2023 Tennessee

This week, Aphorio Carter Fund Management Company, the critical infrastructure and data center division of Carter Funds, announced that it had acquired a fully leased enterprise data center property in Collierville for about $13 million. John Regan, chief investment officer of Aphorio Carter,...

Read more
Read Oppidan Submits Paperwork For a 99,000 sq ft Data Center in Memphis, Tennessee
Oppidan Submits Paperwork For a 99,000 sq ft Data Center in Memphis, Tennessee

Oppidan Submits Paperwork For a 99,000 sq ft Data Center in Memphis, Tennessee

May 05, 2023 Tennessee

The US real estate development company Oppidan has filed plans to construct a data center in Memphis, Tennessee. The company has filed with the Memphis and Shelby County Division of Planning and Development for permission to build a data center at 3900 S. Mendenhall Road. The permit encompasses...

Read more
Read Franklin County Officials Reject Zoning Request For a Crypto Mining Data Center
Franklin County Officials Reject Zoning Request For a Crypto Mining Data Center

Franklin County Officials Reject Zoning Request For a Crypto Mining Data Center

April 21, 2022 Tennessee

The Franklin County Commission has denied a zoning request that would have allowed the development of a crypto data center. The Tullahoma Utilities Authority requested 9.12 acres of land at 6945 Spring Creek Road to be rezoned to a C-1 commercial restricted district from an R-2 general...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?