Street Address
Interested in this information? Contact us
Under ConstructionOperational
Fully operational with expansion in progress
Operated by:

Cipher Mining: Black Pearl

Year Built: 2025
Ownership: Cipher Mining Inc. owns the building.
░░░░░ Request Dataset MW
Total Power
░░░░░░░ Login to view SqFt
Gross Colocation Size

Cipher Mining's Black Pearl Bitcoin mining site in Winkler County, West Texas, began operations in 2025. The company acquired the site in late 2023.

This data center is composed of single-story, pre-engineered metal buildings. The construction of the Black Pearl project involved an investment of around $7 million.

Map and Nearby Locations:

This Facility
Cipher Mining Inc. Sites
Nearby Facilities

Sites within 15 miles of Hub

Distance Site About
11.32 miles Crypto Mining Data Center Request Dataset
In 2025, Bitcoin mining company Genesis Digital Assets Limited (GDA) expanded its Bitcoin mining operations in West Texas, adding 50 megawatts of power capacity at its Pyote mine.
13.16 miles Barrio: Monahans
Barrio Energy operates a site on 10 acres near Monahans, Texas.

Central Ridge Data Center Photos (See all)

Cipher Mining's Black Pearl Site in Texas
Source: Cipher Mining

Operating Company

Operated by:

Cipher Mining Inc. is a technology company. The Company is focused on the development and operation of bitcoin mining data centers. The Company, through its subsidiaries, including Cipher Mining Technologies Inc., operates four bitcoin mining data centers in Texas. It is also developing an additional data center in Winkler County, Texas. Its Odessa data center (the Odessa Facility), which is its wholly owned 207 megawatts (MW) facility located in Odessa, Texas. The Odessa Facility is capable of producing approximately 6.4 exahash per second (EH/s). Its Alborz data center (the Alborz Facility) is located near Happy, Texas. Its Bear data center (the Bear Facility) is located near Andrews, Texas. Its Chief data center (the Chief Facility) is also located near Andrews, Texas. The Chief Facility is a 10 megawatts (MW) data center that is connected to the local electrical grid.

14
Facilities
0
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?