Plaza MaxInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, 63477 Maintal, Germany
Planned
Future facility in planning stage
Operated by:

AWS: Maintal

Year Planned: 2028

AWS is developing a new data center campus in Maintal-Bischofsheim, in the Maintal-West industrial area between the A66 and Frankfurter Straße. The concept includes two server buildings, a dedicated substation, and office/administrative space. The project has been publicly presented to residents, but AWS has not disclosed the facility’s compute capacity, construction start date, or operational date.

Map and Nearby Locations

This Facility
Amazon AWS Sites
Nearby Facilities

Metro ParkInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of PrimeInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us EdgeConneX: Maintal Campus
In Germany’s tightening data center market, EdgeConneX is making a strategic push into the Frankfurt metropolitan area with a proposed campus in Maintal.
NN milesInterested in this information?Contact us Digital Realty: FRA17
Digital Realty is building a massive new campus in Digital Park Fechenheim, the former headquarters of the Neckermann mail-order company.
NN milesInterested in this information?Contact us Digital Realty: FRA18
FRA18 offers 8,200 square meters of colocation space specifically designed to support high-performance computing (HPC) and artificial intelligence (AI) workloads.
NN milesInterested in this information?Contact us Digital Realty: FRA20
FRA20, a new data center, is part of the Digital Realty's Digital Park Fechenheim campus in eastern Frankfurt, Germany. This five-level facility will offer approximately 8,140 square meters of white space.
NN milesInterested in this information?Contact us CloudHQ: FRA-02
CloudHQ, a hyperscale data center developer and operator in the United States and Europe, is currently constructing a 1.2 million sqft (108k sqm), hyperscale data center campus in Offenbach, Germany, a city which borders Frankfurt to the southeast.
NN milesInterested in this information?Contact us FirstColo: Werkhaus
FirstColo's Werkhaus facility has a capacity for more than 1,000 racks across 1,200 sqm (12,917 sq ft) of technical space.
NN milesInterested in this information?Contact us CloudHQ: FRA-01
CloudHQ, a hyperscale data center developer and operator in the United States and Europe, is currently constructing a 1.2 million sqft (108k sqm), hyperscale data center campus in Offenbach, Germany, a city which borders Frankfurt to the southeast.
NN milesInterested in this information?Contact us Carrier-Neutral Data CenterInterested in this information?Contact us
Construction of FRA27 started in 2022 and topped out in 2023. The facility features an IT area of around 4,700 square meters, alongside four white spaces for colocation.

Operating Company

Operated by:

Amazon Web Services (AWS) is a subsidiary of Amazon.com that provides on-demand cloud computing platforms to individuals, companies and governments, on a paid subscription basis.

0
Facilities
0
Markets

News See all

Read AWS Files 36-Building Data Center Plan at 4.5GW Homer City Campus
Amazon Web Services has formally signed on to the largest gas-powered data center project in the United States. Amazon Data Services, Inc., the company's development arm, filed a Preliminary Land D...

AWS Files 36-Building Data Center Plan at 4.5GW Homer City Campus

October 07, 2026 Amazon AWS

Amazon Web Services has formally signed on to the largest gas-powered data center project in the United States. Amazon Data Services, Inc., the company's development arm, filed a Preliminary Land Development Plan with the Indiana County planning commission on August 28 under the project name...

Read more
Read AWS Proposes 36-Building Data Center Campus in Indiana County, Pennsylvania
Amazon Web Services (AWS) has filed plans for a 36-building data center campus at the Homer City Energy Campus in Pennsylvania. AWS first revealed its interest in the area in August while discussin...

AWS Proposes 36-Building Data Center Campus in Indiana County, Pennsylvania

October 07, 2026 Amazon AWS

Amazon Web Services (AWS) has filed plans for a 36-building data center campus at the Homer City Energy Campus in Pennsylvania. AWS first revealed its interest in the area in August while discussing potential development with Homer City Redevelopment. The proposed campus will span 1,100 acres...

Read more
Read AWS Receives Planning Approval for Data Center in Iver, UK
Amazon Web Services (AWS) has received planning approval for a new data center project in Iver, Buckinghamshire, UK. Buckinghamshire Council approved the development, which will replace 17 industri...

AWS Receives Planning Approval for Data Center in Iver, UK

October 01, 2026 Amazon AWS

Amazon Web Services (AWS) has received planning approval for a new data center project in Iver, Buckinghamshire, UK. Buckinghamshire Council approved the development, which will replace 17 industrial and warehouse units with a data center featuring 27 backup generators. Planning officers...

Read more
Read Generac Secures $8bn Backup Generator Deal With Amazon
Generac has signed a long-term deal to supply backup generators to Amazon’s data centers. The agreement includes about $2.4 billion in deliveries over two years and could reach $8 billion overall. ...

Generac Secures $8bn Backup Generator Deal With Amazon

September 26, 2026 Amazon AWS

Generac has signed a long-term deal to supply backup generators to Amazon’s data centers. The agreement includes about $2.4 billion in deliveries over two years and could reach $8 billion overall. Amazon will also have the option to buy nearly 1.7 million Generac shares. “It provides visibility...

Read more
Read Prysmian, Rio Tinto To Supply Low-Carbon Aluminum For Amazon Data Center In Ohio
Italian cable manufacturer Prysmian and mining company Rio Tinto will supply an Amazon data center in Ohio with low-carbon aluminum electrical cables. The aluminum will be produced by Elysis, a joi...

Prysmian, Rio Tinto To Supply Low-Carbon Aluminum For Amazon Data Center In Ohio

September 21, 2026 Amazon AWS

Italian cable manufacturer Prysmian and mining company Rio Tinto will supply an Amazon data center in Ohio with low-carbon aluminum electrical cables. The aluminum will be produced by Elysis, a joint venture between Rio Tinto and Alcoa. Its smelting process uses proprietary inert anodes instead...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?