Atlas Power is developing a $1.9 billion cryptocurrency mining facility in Williston, North Dakota.

  • The project was announced in January 2022, with plans for a 700 MW capacity to be built in three phases.
  • The Atlas facility currently consumes about 240 megawatts.

Map and Nearby Locations:

This Facility
Atlas Power LLC Sites
Nearby Facilities

Sites within 15 miles of Alpha

Distance Site About
7.20 miles Crypto Mining Data Center Request Dataset
Phoenix Group, a UAE-based cryptocurrency mining and blockchain technology company, operates a mining facility in North Dakota, USA, contributing over 2.7 EH/s to its global hash rate.
7.20 miles Crypto Mining Data Center Request Dataset
In 2025, Vancouver-based Cathedra Bitcoin, a developer and operator of crypto mining and data center infrastructure, sold its Bitcoin mining facility located in North Dakota.
8.61 miles Fighting Pike 6
This facility will be part of the third phase of development for Critical Data House's Project Fighting Pike in Williston, North Dakota.
8.62 miles Fighting Pike 7
This facility will be part of the third phase of development for Critical Data House's Project Fighting Pike in Williston, North Dakota.
8.79 miles Fighting Pike 3
This facility will be part of the second phase of development for Critical Data House's Project Fighting Pike in Williston, North Dakota.
8.79 miles Project Fighting Pike
The development includes seven buildings, ranging from 275,000 to 500,000 sq ft (25,550 to 46,450 sqm). These facilities will utilize a closed-loop cooling system with direct-to-chip liquid cooling.
8.96 miles Fighting Pike 2
This facility will be part of the first phase of development for Critical Data House's Project Fighting Pike in Williston, North Dakota.
8.99 miles Fighting Pike 4
This facility will be part of the second phase of development for Critical Data House's Project Fighting Pike in Williston, North Dakota.
9.15 miles Fighting Pike 5
This facility will be part of the second phase of development for Critical Data House's Project Fighting Pike in Williston, North Dakota.

Three Data Center Photos (See all)

Rendering of Atlas Power Williams County facility, North Dakota
Source: Valley News

Operating Company

Operated by:
2
Facilities
0
Markets
185MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?