Aruba’s Global Cloud Data Center (IT3) is in Ponte San Pietro, Bergamo, near Milan. All the center’s systems have been designed and built to meet and exceed the highest levels of resilience set by ANSI/TIA 942-A Rating 4 (formerly Tier 4).
The 200,000 sqm campus has an area of 90,000 sqm which designated as data center space. The campus has up to 90MW of power with a two utility connections. The campus operates with 100% renewable energy source, self-produced using hydroelectric and photovoltaic system or drawn from the network with guarantee of renewable energy certification.
DC-A Features
- Total surface area: 17.600 m2
- Data hall surface area: 8.050 m2
- Connection points to utilities: 2
- UPS redundancy: 2N+1
- UPS type: double conversion static
- Individual UPS power: 500kVA
- Generator redundancy: 2N
- Generator type: diesel generator units
- Full load run time: 26h in emergency conditions, 52h in standard conditions
- UPS run time: 15 minutes at full power on single module in emergency conditions - 40 minutes in standard conditions