Alignment Engine: Chillicothe

Latest Podcast 232 E 8th St
Planned
Future facility in planning stage
Operated by:

Alignment Engine: Chillicothe

Year Planned: 2027
Utility Provider: AEP Ohio
Ownership: Alignment Engine leases part of the former pixelle paper mill campus from u.s. paper mill llc. the building.

Alignment Engine, a GPU cloud provider based in Canton, Ohio, that markets itself as Aligned, plans an AI data center on about 6.5 acres of the former Pixelle paper mill campus in Chillicothe, Ohio. The data hall will reuse the former Chilpaco building. U.S. Paper Mill LLC bought the mill in October 2025 and owns the campus.

The project carries a planned $1.5 billion investment and about 240 jobs. The company has not asked for a tax abatement.

Site History

  • In September 2026, Chillicothe lifted the 60-day data center moratorium it passed in August. The city is drafting data center zoning rules.
  • In July 2026, Alignment Engine said it will deploy AMD Helios systems with AMD Instinct MI455X GPUs at its Ohio data center from 2027.
  • In July 2026, the high-performance computing campus plan for the former paper mill was announced.
  • In October 2025, U.S. Paper Mill LLC bought the idle Pixelle mill.

Project Profile

  • Operator: Alignment Engine (Aligned)
  • Landlord: U.S. Paper Mill LLC
  • Site: about 6.5 acres of the mill campus at 232 East 8th Street
  • Computing: AMD Helios rack-scale systems
  • Status: Planned

Map and Nearby Locations

232 E 8th St
Alignment Engine Sites
Nearby Facilities

Alignment Engine: Chillicothe Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Alignment Engine: Chillicothe

Distance Site About
0.75 miles Shentel: Chillicothe, OH
Chillicothe Telephone Company central office and headquarters complex at 68 East Main Street in Chillicothe, Ohio. Shentel has owned the company, part of Horizon Telcom, since 2024. The building houses the main switch and network operations center for the Chillicothe area.
13.67 miles Verizon: Waverly, OH
Verizon central office at 300 East Second Street in Waverly, Ohio, built and run by Frontier North before Verizon bought Frontier. It is the local switching center for Waverly.

Operating Company

Operated by:

Alignment Engine, Inc., which markets itself as Aligned, is a privately held AI infrastructure company based in Canton, Ohio. It offers bare-metal GPU infrastructure as a service and custom AI model training and inference on AMD Instinct accelerators.

In July 2026, the company said it will deploy AMD Helios rack-scale systems with AMD Instinct MI455X GPUs at its Ohio data center from 2027. The data center is planned for part of the former paper mill campus in Chillicothe, Ohio.

0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.