Data Center Campus

Telehouse: Frankfurt Campus

8 sites Frankfurt
OperationalLand Bank
Operational facility with additional land for expansion
Developed by:

Campus at a Glance

8 data centers on this campus
First built in 1998 with expansions through 2029
Total building size: ░░░░░░░ Request Dataset SqFt
Coordinates: 50.09598, 8.62981
░░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

A major 2026 expansion is planned for the Telehouse campus, bringing the total number of facilities to six. The six facilities will include two smaller operational sites, along with the historically significant Telehouse A-North, which Telehouse inherited when it acquired Databurg in 2012.

Access to power can be a struggle in the Frankfurt market, but Telehouse struck a deal with local provider Mainova in 2012 where in return for access to free land, the provider built a 110kV substation on campus in late 2016. All Telehouse builds on campus will connect into the new substation.

Power:


• Power to rack up to 8kW with higher scalable options
• N+1 redundant UPS-supported supplies with battery backup
• Up to 21MVA uninterruptible emergency power
• Sub-distribution according to customer specifications with separate power supply meterings
• The data centre can be kept fully operational for three days in the event of a power failure through diesel generators

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Telehouse: FRA Bldg-A Telehouse
Operational
░░░░ Request Dataset MW — 1998
Telehouse: FRA Bldg-C Telehouse
Operational
░░░░ Request Dataset MW — 1998
Telehouse: FRA Bldg-I Telehouse
Operational
░░░░ Request Dataset MW — 1998
Telehouse: FRA Bldg-K Telehouse
Operational
░░░░ Request Dataset MW — 1998
Telehouse: FRA Bldg-D Telehouse
Operational
░░░ Request Dataset MW — 2020
Telehouse: FRA Bldg-M Telehouse
Operational
░░░ Request Dataset MW — 2023
Telehouse: FRA Bldg-N Telehouse
Operational
░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2026
Carrier-Neutral (Telco-Owned) Data CenterInterested in this information?Contact us Telehouse
Land Bank
— — 2029

Map and Nearby Locations

Telehouse: Frankfurt Campus Power Growth Over Time

+44% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Developer

Developed by:

Telehouse is a subsidiary of KDDI Corporation. KDDI was founded in 1984 and is headquartered in Tokyo, Japan.

History (by site):


1989: New York Teleport site
1990: London Docklands North
1997: New York 25 Broadway
1997: London Metro
1998: Expanded to Los Angeles
1999: London Docklands East
1999: Paris Voltaire
2000: Asian expansion in Hong Kong & Seoul
2008: Beijing BEZ & Singapore
2009: Paris Magny
2010: London Docklands West
2010: Hanoi & Shanghai Jinqiao
2010: Johannesburg
2011: Hong Kong CCC
2011: New York Chelsea
2011: Istanbul
2012: Frankfurt and Moscow
2012: Beijing BDA
2013: Shanghai Zhangjiang

0
Facilities
0
Markets
0MW
Megawatts

Documents

Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.