Data Center Campus

Takanock: Project Eagle Campus

Takanock's planned three-building data center campus near Luke Air Force Base, west of Phoenix, powered by an on-site natural gas plant.

3 sites Phoenix
Planned
Future facility in planning stage
Developed by:

Campus at a Glance

3 data centers on this campus
First built in 2028 with expansions through 2031
Coordinates: 33.56881, -112.37188
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

Takanock is developing three data centers as Project Eagle on about 160 acres near Litchfield Road and Olive Avenue, about 15 miles west of Phoenix. Montera Infrastructure, Stonepeak's data center platform, co-develops the project, and DigitalBridge and ArcLight back Takanock. An on-site natural gas plant with 18 turbines will power the campus, and a future APS substation will connect it to the grid. Glendale annexed and rezoned the site in October 2026, and the city expects the first building to open in 2028.

The neighboring Luke Air Force Base is a Superfund site because of historical soil and groundwater contamination. The project must meet the base's standards, including limits on turbine emissions. EPCOR will provide water and sewer service. The developers expect about 1,000 construction jobs and 200 permanent jobs.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Takanock: Project Eagle Bldg1 Takanock
Planned
— — 2028
Takanock: Project Eagle Bldg2 Takanock
Planned
— — 2030
Takanock: Project Eagle Bldg3 Takanock
Planned
— — 2031

Map and Nearby Locations

Takanock: Project Eagle Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Developer

Developed by:

Founded in early 2023, Takanock is a stealth-mode company focused on solving the looming power shortage in the data center industry. Takanock has developed a patent-pending data center design, enabling utilization of backup generators as flexible grid resources without jeopardizing reliability during periods of grid outages.

To help encourage the adoption of the Takanock design, has evolved into a "tip-of-the-spear" data center developer. Since the beginning of 2024, Takanock has assembled a portfolio of sites across the United States and is in the process of permitting and entitling these sites for use as data centers. Once shovel-ready, Takanock will sell these sites to data center operators looking to build, own and operate the next generation of digital infrastructure.

0
Facilities
0
Markets
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.