Data Center Campus

Takanock: Project Baccara

2 sites Phoenix
Planned
Future facility in planning stage
Operated by:

Campus at a Glance

2 data centers on this campus
First built in 2028 with expansions through 2030
Coordinates: 33.56881, -112.37188
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

Backed by DigitalBridge, the Project Baccara development is an ambitious 160-acre industrial project spearheaded by Takanock, located near the Luke Air Force Base. This strategic site, situated 15 miles west of Phoenix, is adjacent to a major training base for the Air Education and Training Command that is also a designated "superfund site" due to historical soil and groundwater contamination.

The master plan features two massive two-story data centers, each spanning approximately 1 million square feet, supported by an on-site 700MW natural gas power plant set to occupy 23.7 acres. Construction is scheduled to begin in Q3 2026, with a phased rollout that aims to bring the first data center online in Q1 2028 and the second building online by Q1 2030.

While EPCOR manages the water and sewer services, the project is expected to be a major regional employer, creating roughly 1,000 construction jobs and 200 permanent operational roles.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Takanock: Baccara Bldg1 Takanock
Planned
— — 2028
Takanock: Baccara Bldg2 Takanock
Planned
— — 2030

Map and Nearby Locations

Takanock: Project Baccara Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

Founded in early 2023, Takanock is a stealth-mode company focused on solving the looming power shortage in the data center industry. Takanock has developed a patent-pending data center design, enabling utilization of backup generators as flexible grid resources without jeopardizing reliability during periods of grid outages.

To help encourage the adoption of the Takanock design, has evolved into a "tip-of-the-spear" data center developer. Since the beginning of 2024, Takanock has assembled a portfolio of sites across the United States and is in the process of permitting and entitling these sites for use as data centers. Once shovel-ready, Takanock will sell these sites to data center operators looking to build, own and operate the next generation of digital infrastructure.

0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?