Data Center Campus

TAC: Great Falls Project Cardinal Campus

TAC Data Centers' proposed Project Cardinal hyperscale campus on a 569-acre ranch tract beside the AgriTech Park in Great Falls, Montana. Announced in 2025, TAC withdrew it later that year after NorthWestern Energy could not meet its power timeline.

2 sites Montana
Withdrawn
Project cancelled before construction
Developed by:

Campus at a Glance

2 data centers on this campus
First built in 2027 with expansions through 2030
Coordinates: 47.52971, -111.18399
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

Project Cardinal was TAC Data Centers' proposed hyperscale campus on the northeast edge of Great Falls, Montana. The land is a ranch tract of about 550 acres that the Roehm family owns; TAC marketed it as 569 acres. It is Tract 1 of Cascade County Certificate of Survey 5483. The tract lies outside city limits, east of the Great Falls AgriTech Park and north of Malmstrom Air Force Base, near NorthWestern Energy's Rainbow substation and the southern end of the Montana-Alberta Tie Line.

TAC is the data center platform of Atlanta-based The Ardent Companies, a different company from Northern Data's Ardent Data Centers. The Great Falls Development Alliance announced the project in June 2025. TAC's site plan showed up to 20 single-story buildings with about 2 million square feet in total, and two on-site substations, one for the utility and one for the owner. The estimated investment was $1 billion to $1.5 billion. The City of Great Falls would have had to annex and zone the land. The cooling design was recirculating, with water from the city or from former smelter water rights.

TAC asked NorthWestern Energy for power, but the utility's transmission study moved slowly. TAC also talked with other suppliers, including BHE Montana, BHE Canada and AlbertaEx. In November 2025 the Development Alliance said TAC had withdrawn because the power timelines did not fit, and TAC released its option on the land. No annexation or zoning request reached a public vote. The 2026 tax roll still lists the Roehm family as owner.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
TAC: Great Falls 1 TAC Data Centers
Withdrawn
— — 2027
TAC: Great Falls Expansion TAC Data Centers
Withdrawn
— — 2028

Map and Nearby Locations

TAC: Great Falls Project Cardinal Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Developer

Developed by:

TAC Data Centers brings unmatched expertise and a proven track record to the world of hyperscale data center site identification, entitlements/permitting, and development. With a team possessing over 100 years of combined experience in site selection, due diligence, development, and construction, the company delivers solutions tailored to the unique needs of the data center industry.

0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?