Data Center Campus

Switch: Atlanta (The Keep Campus)

Switch's Southeastern Prime campus on Switch Way in Lithia Springs, Douglas County, west of Atlanta, with four data center buildings inside one secured perimeter. First built in 2020, with expansions through 2027.

4 sites Atlanta
OperationalUnder ConstructionPlanned
Operational facility with ongoing expansion and future phases planned
Developed by:

Campus at a Glance

4 data centers on this campus
First built in 2020 with expansions through 2027
Total building size: ░░░░░░░ Request Dataset SqFt
Coordinates: 33.75873, -84.59034
░░░░ Request Dataset MW
Operational
░░░░ Request Dataset MW
Under Construction
░░░░ Request Dataset MW
Planned

The Keep is Switch's Southeastern Prime campus on Switch Way (formerly Douglas Hill Road) in Lithia Springs, Douglas County, west of Atlanta. Switch announced it in May 2017 as its fourth Prime campus, with a planned $2.5 billion investment at full build-out.

Land and ownership. The campus covers about 97 acres of an industrial district next to Google's Douglas County data center. The Development Authority of Douglas County holds title under a bond-lease tax abatement, and Switch operates the campus. DigitalBridge and IFM Investors took Switch private in December 2022.

Power and infrastructure. Georgia Power serves the campus through a 230 kV substation inside the north end of the secured perimeter. Each building has its own diesel standby generator plant under Georgia EPD air permit 7375-097-0091. Switch markets the campus as 100% renewable-powered.

Milestones. In November 2020 Switch signed a global logistics company as the campus anchor tenant. Switch's KEEP 2.0 Atlanta North campus in Cartersville extends the brand north of the metro.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Switch: Atlanta 1 Switch
Operational
░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2020
Switch: Atlanta 3 Switch
Operational
░░░░ Request Dataset MW ░░░░░░░ Request Dataset SqFt 2023
Switch: Atlanta 2 Switch
Under ConstructionPlanned
— — 2026
Switch: Atlanta 4 Switch
Under ConstructionPlanned
— — 2026

Map and Nearby Locations

Switch: Atlanta (The Keep Campus) Power Growth Over Time

+100% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Developer

Developed by:

Switch, the technology infrastructure corporation headquartered in Las Vegas, Nevada is built on the intelligent and sustainable growth of the internet. Switch founder and CEO Rob Roy has developed more than 500 issued and pending patent claims covering data center designs that have manifested into the company’s world-renowned data centers.

Switch has PRIME campuses located in Las Vegas and Tahoe Reno, Nevada; Grand Rapids, Michigan; and Atlanta, Georgia.

0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?