Data Center Campus

Reef Origin: Elevate Quarter Campus

2 sites London
Planned
Future facility in planning stage
Operated by:

Campus at a Glance

2 data centers on this campus
First built in 2027 with expansions through 2029
Coordinates: 51.88779, -0.20356
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

The Elevate Quarter data centers in Stevenage, UK, represent a landmark £900 million ($1.2 billion) co-location project engineered to merge digital infrastructure with advanced medicine.

Backed by a joint venture between Reef Origin and Swiss bank UBS (operating under the Forge_Kn platform), the development will feature two high-performance computing facilities carved out of a 30-acre site adjacent to GSK’s global R&D hub. Positioned within the London Public Cloud Region and backed by an initial 24MVA power delivery slated for Q1 2027, these purpose-built data centers will provide the massive processing power and AI capabilities necessary to anchor Europe’s largest cluster for cell and gene therapy.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Reef Origin: Elevate Quarter 1 Reef Origin
Planned
— — 2027
Reef Origin: Elevate Quarter 2 Reef Origin
Planned
— — 2029

Map and Nearby Locations

Reef Origin: Elevate Quarter Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:
0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?