Gray Wolf's Amston 1 Data Center will leverage behind-the-meter power, operating independently of the electrical grid. This will be achieved through on-site natural gas-powered solid oxide fuel cells or linear generators, for which the necessary state regulatory approvals have already been secured.
These sustainable technologies are designed to transition to biofuel, renewable natural gas, or hydrogen when available, though such fuels are not currently accessible in Connecticut. Classified as Class 1 Renewable, this approach will address the region’s constrained grid, with no plans for grid connection upon completion.
Buildings
| Site | Operator | Status | Operational | Building Size | Built |
|---|---|---|---|---|---|
| Gray Wolf: Colchester 1 | Gray Wolf Data Centers |
Planned
|
— | — | 2027 |
| Gray Wolf: Colchester 2 | Gray Wolf Data Centers |
Planned
|
— | — | 2027 |
Gray Wolf Data Centers is revolutionizing the future of technology with purpose-built, high-density data centers strategically located in secondary U.S. cities.
Empowering innovation through scalable, energy-efficient, and secure edge data centers, enabling businesses to thrive in AI, blockchain, and decentralized technologies.