Data Center Campus
The Goodman PAR01 Data Centre is being developed on a 53,000 sqm plot located near Paris and the Roissy Charles de Gaulle Airport. This project is noteworthy for its pioneering commitment to a circular deconstruction approach.
The centre will include two separate buildings, each designed with its own entrance, an office area, a technical equipment room, and a mechanical/power yard. Each block will consist of three floors, accommodating two data halls per floor, with each individual hall projected to total around 1,380 sqm.
Buildings
| Site | Operator | Status | Operational | Building Size | Built |
|---|---|---|---|---|---|
| Goodman: PAR01-A | Goodman Group |
Under Construction
|
— | — | 2027 |
| Goodman: PAR01-B | Goodman Group |
Planned
|
— | — | 2028 |