Data Center Campus
Edged Energy's planned MSP01 data center campus in the Minneapolis-St. Paul area, listed in Edged's 2025 development pipeline with a first building targeted for 2029. The exact site is undisclosed.
Edged Energy lists MSP01 in its development pipeline as a multi-building campus in the Minneapolis-St. Paul market. MSP01-1 is the first building; later phases sit on the Expansion record. Edged designs its sites around waterless cooling. Edged has not disclosed the site and no public filings have surfaced, so the map pin is approximate.
Buildings
| Site | Operator | Status | Operational | Building Size | Built |
|---|---|---|---|---|---|
| Edged Energy: MSP01-1 | Edged Energy |
Planned
|
— | — | 2029 |
| Edged Energy: MSP01 Expansion | Edged Energy |
Planned
|
— | — | — |