Data Center Campus

CyrusOne: Chandler Phoenix Campus

10 sites Phoenix
OperationalPlanned
Operational with future phases planned
Operated by:

Campus at a Glance

10 data centers on this campus
First built in 2012 with expansions through 2027
Coordinates: 33.27074, -111.88206
░░░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░ Request Dataset MW
Planned

Located on a 85-acre campus in Chandler, the company plans to build a nearly 2 million square-feet data center campus.

Building

  • SOC 1 type 2, SOC 2 type 2, PCI DSS (section 9 and 12), HIPAA, ISO 27001, FISMA, built to TIA 942 Class 4 specifications
  • High-performance computing (HPC) capable; supports 250 watts per square foot, with the ability to support over 1,000 watts per square foot
  • Historically free of seismic activity, tornados and hurricanes
  • Carrier-neutral and part of the CyrusOne National Internet Exchange (IX)
  • 100% uptime service-level agreements on power
  • 24/7 year-round staffed network operations center and remote hands support
  • Dedicated cages and private suite options available

Power

  • Multiple levels of redundancy available within the same footprint (N, 2N)
  • 160 MW on-site substation
  • Dual underground power feeds to on-site substation
  • Dual-input power-distribution units (PDUs) with static transfer switches.
  • Scalable to six 2.25MW Detroit Diesel dedicated generators pre-wired for additional capacity.
  • 5,000-gallon diesel fuel belly tanks

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
CyrusOne PHX1 CyrusOne
Operational
░░░ Request Dataset MW — 2012
CyrusOne PHX2 CyrusOne
Operational
░░░ Request Dataset MW — 2015
CyrusOne PHX3 CyrusOne
Operational
░░░ Request Dataset MW — 2016
CyrusOne PHX4 CyrusOne
Operational
░░░ Request Dataset MW — 2017
CyrusOne PHX6 CyrusOne
Operational
░░░░ Request Dataset MW — 2017
CyrusOne PHX5 CyrusOne
Operational
░░░ Request Dataset MW — 2018
CyrusOne PHX7 CyrusOne
Operational
░░░░ Request Dataset MW — 2022
CyrusOne PHX8 CyrusOne
Operational
░░░░ Request Dataset MW — 2023
CyrusOne PHX10 CyrusOne
Planned
— — 2027
CyrusOne PHX9 CyrusOne
Planned
— — 2027

Map and Nearby Locations

CyrusOne: Chandler Phoenix Campus Power Growth Over Time

+35% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

CyrusOne is a data center owner, operator, and developer that manages more than 50 facilities, with its footprint concentrated in the U.S. and Europe. The company is based in Dallas and was taken private in March 2022 by funds managed by KKR and Global Infrastructure Partners in a transaction valued at approximately 15 billion dollars including debt.

Its portfolio centers on hyperscale and enterprise colocation across multi-building campuses. CyrusOne has also pursued international growth initiatives alongside its core North American and European markets.

CyrusOne History:

  • March 2022: Taken private by funds managed by KKR and Global Infrastructure Partners in an approximately 15 billion dollar all-cash transaction including debt.
  • July 2015: Acquired Cervalis, adding four data centers and two disaster recovery sites in the New York metro.
  • July 2014: Acquired Cervalis
  • January 2013: Completed initial public offering on NASDAQ as a carve-out of Cincinnati Bell’s data center business.
  • June 2010: Cincinnati Bell acquired CyrusOne for approximately 525 million dollars.
  • 2000: Founded by David Ferdman.
0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?