Data Center Campus

Amazon: Padre Hurtado Campus

2 sites Santiago
OperationalPlanned
Operational with future phases planned
Developed by:

Campus at a Glance

2 data centers on this campus
First built in 2025 with expansions through 2028
Total building size: ░░░░░░ Request Dataset SqFt
Coordinates: -33.55657, -70.81282
░░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░ Request Dataset MW
Planned

Amazon Web Services (AWS) is moving forward with its $205 million data center project in Chile. This campus represents the first facility built by Amazon’s cloud platform in the South American country.

The project is located on an 18.7-hectare site in Santiago's Padre Hurtado district, and the first building is already online. This initial stage encompasses a 4,630 square meter (49,835 sq ft) data center.

The campus will also include 12 diesel backup generators, along with low-water consumption air conditioning, cooling, and fire control systems. A second data center building, scheduled for 2028, will extend the total space by an additional 3,470 square meters (37,350 sq ft).

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
South CenterInterested in this information?Contact us Amazon AWS
Operational
░░░░ Request Dataset MW ░░░░░░ Request Dataset SqFt 2025
Cloud StationInterested in this information?Contact us Amazon AWS
Planned
— — 2028

Map and Nearby Locations

Amazon: Padre Hurtado Campus Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Developer

Developed by:

Amazon Web Services (AWS) is a subsidiary of Amazon.com that provides on-demand cloud computing platforms to individuals, companies and governments, on a paid subscription basis.