Published in North America

Activate Capital Invests in Xnrgy

Jul 23, 2025 | Posted by Abdul-Rahman Oladimeji

Venture capital firm Activate Capital this week announced a strategic investment in Xnergy Climate System, a North American manufacturer of air handling and liquid cooling technologies. This  investment will support Xnrgy's growth, expand its domestic manufacturing presence, and accelerate the delivery of new cooling solutions for data centers and other mission-critical infrastructure.

"We are thrilled to partner with Activate Capital as we enter this next phase of growth," said Wais Jalali, founder and CEO of Xnrgy. "Their expertise in scaling sustainable technologies aligns with our vision to deliver ultra-efficient cooling systems that meet the performance, environmental, and reliability demands of our customers."

"Data centers are among the most energy-intensive assets in the digital economy, and chillers are the central, long-lead infrastructure component that defines their thermal performance," said Anup Jacob, managing partner at Activate Capital. "Xnrgy's technical depth and domestic manufacturing capabilities position it to deliver the efficiency breakthroughs needed to support the AI-driven transformation of global infrastructure."

There are 4920 data centers in North America.

Tentative site plan for Zydeco Development's data center in Hutto, Texas
Posted in Zydeco Development: Hutto, Texas Source: Zydeco
Proposed site for IND A1 data center in Indianapolis
Posted in Metrobloks: Indianapolis A1 Source: Metrobloks
Posted in DataBank: Los Angeles |
Posted in Edged: Phoenix |
Posted in Bell: Regina |
The Autophone of Laredo data center in Texas (Image 5)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center Texas (Image 4)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center Texas (Image 3)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center in Texas (Image 2)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center in Texas (Image 1)
Posted in Autophone: Laredo Source: Autophone of Laredo
Posted in Google: Project Cannoli |
A view of the Hut 8 Vaughan data center
Posted in Hut 8: Vaughan DC Source: Hut 8 Canada
A view of the Hut 8 Mississauga data center
Posted in Hut 8: Mississauga DC Source: Hut 8 Canada
A view of the Hut 8 Kelowna data center exterior.
Posted in Hut 8: Kelowna DC Source: Hut 8 Canada
A view of the Hut 8 Vancouver Vault data center exterior.
Posted in Hut 8: Vancouver Vault DC Source: Hut 8 Canada
A view of the Hut 8 Vancouver data center exterior
Posted in Hut 8: Vancouver DC Source: Hut 8 Canada
Site Aerial Map
Posted in Grandilla: Phoenix, Arizona Source: https://mccobagenda.databankcloud.com/AgendaOnline/Documents/DownloadFileBytes/02.03%20CPA250009%20Z250027%20BOS%20REPORT.PDF.pdf?documentType=1&meetingId=4622&itemId=264342&publishId=145477&isSection=False&isAttachment=True
Meta: Project Domino
Posted in Meta: Project Domino Source: https://www.datacenterdynamics.com/en/news/meta-announces-1gw-data-center-campus-in-indiana/
Sequitor Edge Data Center
Posted in Sequitor Edge: Rapid City, South Dakota Source: https://sequitoredge.com/news/sequitor-edge-data-center-coming-to-rapid-city/
Proposed site for Wildwood Ranch AI Campus in Joplin, Missouri
Posted in Wildwood Ranch: Joplin, MO Source: Joplin City Council
Proposed site for Takanock's Project Baccara in Arizona
Posted in Takanock: Project Baccara Source: Takanock
Proposed sitemap for Project Laurel in Limerick Township
Posted in Project Laurel Source: Limerick Township | MCD 7 LLC
Proposed site plan for Project Flex in Lyon Township, Michigan
Posted in Verrus: Project Flex Source: Verrus
Proposed siteplan for Project Delta in Stokes County
Posted in Project Delta Source: Project Delta
EdgeConneX acquired a 180-acre parcel near AUS01 in Bastrop, Texas.
Posted in EdgeConneX: Austin AUS01 Source: Bastrop CAD
Preliminary siteplan for Cloverleaf's data center in St. Louis, Missouri
Posted in Cloverleaf: Troy Campus Source: Cloverleaf Infrastructure

Ready to Level up Your
Data Center Strategy?