About the Event

The Data Center Construction, Design & Engineering Forum London is TBM Group's European conference on planning, designing and building data center capacity. The fifth edition runs April 14 to 15, 2027 in London. It is a closed-door, invitation-only event for hyperscalers, colocation providers, developers, investors, engineering consultancies, contractors and equipment manufacturers. TBM Group lists 150 users, 10 sponsors and 30 speakers for the event.

Programming Focus

  • Hyperscale and AI-ready campus development
  • High-density compute and next-generation cooling
  • Power strategy, grid connection and energy resilience
  • Design standardization and global delivery frameworks
  • Modular construction and industrialized delivery
  • Electrical and mechanical systems integration
  • Commissioning, operational readiness and reliability
  • Supply chain and procurement for critical infrastructure
  • Sustainability, waste heat use and energy efficiency
  • Site selection, permitting and infrastructure planning across Europe

Featured Speakers

Speakers announced as of November 2026:

Data Center Operators and Developers: Scott King (Vice President, Data Center Construction, 5C), Svein Atle Hagaseth (Founder and CEO, Heim Datacenter), Miguel Pascual (CTO, Alto Infrastructure), Wouter Mezger (COO, Penta Infra), Francesco Sellaro (Director Construction EMEA South, Equinix), Jakob Bergstedt (CTO, Conapto), Dr. Martina Kiehas (Head of ESG, maincubes), Penny Madsen (Vice President, Strategy Research, STACK Infrastructure), Kenneth Dalton (Operations Director, Global Switch), Dr. Margarita Redondo (Group Preconstruction Director, GARBE.DC), Stephen Henley (EMEA VP of Design Engineering & Construction, Digital Realty), Cora Olsen (Director of Sustainability & Regeneration, atNorth), Alistair Barnes (Global Head of Mechanical Engineering, Colt Data Centre Services), Allan Bosley (Director, Public Affairs, Ark Data Centres), Carolle Vallee (Head of Procurement and Contracts, Tillion Data Centers)

Hyperscale, Cloud and AI: Dr Arts Yang (Principal Global Architect, NVIDIA), Paul Vivash (Head of Sustainability, Global, CoreWeave), Hammayun Ali (Director, Infrastructure Capacity Strategy & Program Delivery, Oracle), Alexandre Viana de Miranda (Director, Cloud Infrastructure EMEA, Microsoft)

Engineering, Construction and Services: Adrian Del Maestro (Vice President, Global Energy Markets, AECOM), Morten Risnes (Project Manager, Data Centers, Consto), James Feeney (VP AI/HPC Data Centre Strategy and Development EMEA, Salute), Roy Maxwell (Director ESG & Product Management, KEVLINX), Simon Allen (Ambassador, Nomad Futurist Foundation)

Sponsors

Silver: DEHN

Institutional partner: Nomad Futurist Foundation

Who Should Attend

  • Hyperscale and colocation design, engineering and construction leaders
  • Data center developers and investors
  • Engineering consultancies and contractors
  • Equipment manufacturers and technology partners

Logistics

  • End user delegate pass: €2,999 for two days, including the online documentation package
  • Vendor delegate pass: €3,499
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.