E11: Building India’s Digital Backbone with Sharad Agarwal
Mar 12, 2026 Eric Bell World
Go to PodcastYorkshire Energy Park is a business and energy park on the former Hedon Aerodrome, east of Hull. Its first data centre phase is approved for 240 racks, expandable to 600. The developers include Sewell Group, Vital Energi and Chiltern Group, and the land is owned by Hull City Council.
| Distance | Site | About |
|---|---|---|
| 6.15 miles | University of Hull: Hull Data Centre |
University of Hull data centre on Inglemire Lane, Hull, built for the university's high-performance computing service with a colocation hall run with KCOM.
|
| 6.42 miles | Enterprise Data CenterInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 8.80 miles | Greystoke: Humber Tech Park DC1 |
Building 1 is the northernmost of three planned AI training data center buildings at Greystoke's Humber Tech Park in South Killingholme, North Lincolnshire. The campus electricity substation sits beside it.
|
| 8.89 miles | Greystoke: Humber Tech Park DC2 |
Building 2 is the middle of three planned AI training data center buildings at Greystoke's Humber Tech Park in South Killingholme, North Lincolnshire.
|
| 8.98 miles | Greystoke: Humber Tech Park DC3 |
Building 3 is the southernmost of three planned AI training data center buildings at Greystoke's Humber Tech Park in South Killingholme, North Lincolnshire. The district heating unit sits next to it.
|
| 11.83 miles | Elsham Bldg7 |
This facility is part of the Elsham Teck Park in North Lincolnshire, England.
|
| 11.91 miles | Elsham Bldg6 |
This facility is part of the Elsham Teck Park in North Lincolnshire, England.
|
| 11.93 miles | Elsham Bldg10 |
This facility is part of the Elsham Teck Park in North Lincolnshire, England.
|
| 11.93 miles | Elsham Bldg11 |
This facility is part of the Elsham Teck Park in North Lincolnshire, England.
|
| 12.01 miles | Elsham Bldg15 |
This facility is part of the Elsham Teck Park in North Lincolnshire, England.
|
| 12.02 miles | Elsham Bldg5 |
This facility is part of the Elsham Teck Park in North Lincolnshire, England.
|
| 12.02 miles | Elsham Bldg14 |
This facility is part of the Elsham Teck Park in North Lincolnshire, England.
|
| 12.15 miles | Elsham Bldg4 |
This facility is part of the Elsham Teck Park in North Lincolnshire, England.
|
| 12.21 miles | Elsham Bldg8 |
This facility is part of the Elsham Teck Park in North Lincolnshire, England.
|
| 12.22 miles | Elsham Bldg9 |
This facility is part of the Elsham Teck Park in North Lincolnshire, England.
|
| 12.24 miles | Elsham Bldg3 |
This facility is part of the Elsham Teck Park in North Lincolnshire, England.
|
| 12.46 miles | Elsham Bldg12 |
This facility is part of the Elsham Teck Park in North Lincolnshire, England.
|
| 12.46 miles | Elsham Bldg13 |
This facility is part of the Elsham Teck Park in North Lincolnshire, England.
|
| 12.73 miles | Elsham Bldg1 |
Spanning 1.5 million m² (16.1 million sq ft), Elsham Tech Park is a data centre campus planned near Scunthorpe in Lincolnshire, England.
|
| 12.79 miles | Elsham Bldg2 |
This facility is part of the Elsham Teck Park in North Lincolnshire, England.
|
| 19.49 miles | Rivington Energy: Conesby 1 |
The Conesby Data Centre Campus in Scunthorpe, Lincolnshire, is a pioneering 20-acre co-located development by Rivington Energy designed specifically to support high-density AI and cloud computing workloads.
|
| 19.52 miles | Rivington Energy: Conesby 2 |
This facility is part of Rivington Energy's Conesby Data Centre Campus in Lincolnshire, UK.
|
Yorkshire Energy Park is developed through Hull Eco Park Ltd, a joint venture led by Sewell Group with Vital Energi and Chiltern Group, on land owned by Hull City Council. The 212-acre park sits on the former Hedon Aerodrome east of Hull, inside the Humber Freeport.
The park is marketed to data centres, advanced manufacturers and logistics occupiers around a secured grid connection and on-site generation. Its first phase includes a data centre and a gas-fired combined heat and power energy centre.
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to PodcastTell us what you're looking for. We respond within one business day.