WBS Power: Baltic DC Campus

Latest Podcast
BC-Wind Onshore Substation
PlannedProspective Expansion
Future facility in planning stagefacility with prospective expansion planned
Operated by:

WBS Power: Baltic DC Campus

Site planned for 2028 and has expansions through 2035

WBS Power is planning the Baltic Data Center Campus in Choczewo, Poland.

The project is split into four development phases, with Phase I requiring an estimated investment of €6.9–€8.6 billion ($8–$10 billion) and targeting a 2029 operational launch. The site will connect to the adjacent Choczewo power substation, using closed-loop cooling and drawing 40% of its electricity via external renewable Power Purchase Agreements (PPAs) to supplement grid consumption.

Map and Nearby Locations:

BC-Wind Onshore Substation
WBS Power Sites
Nearby Facilities

WBS Power: Baltic DC Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

WBS Power: Baltic DC Campus Data Center Photos (See all)

Rendering of WBS Power's Baltic DC Campus in Poland
Source: WBS Power

Operating Company

Operated by:

About WBS Power
WBS Power is a leading independent player in the European renewable energy sector, distinguished by a proven business model and an extensive track record across the development, Engineering, Procurement, and Construction (EPC), and Independent Power Producer (IPP) value chains.

3
Facilities
0
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?