VSIX: Padova

Latest Podcast Galleria Spagna 28
Operational
Fully operational facility
Operated by:

VSIX: Padova

Year Built: 2009
Utility Provider: e-distribuzione
░░░░ Request Dataset MW
Operational Power

The University of Padova set up VSIX as a neutral access point and telehouse for north-east Italy, and it runs two data centers in the Interporto area. The original telehouse has five technical rooms of Tier II design on the sixth floor of a commercial complex. The Cubo, a two-storey building at Galleria Spagna 14, holds a ground-floor data center designed to Tier III / Rated 3, with two hot-aisle islands of 12 racks, its own medium-voltage cabin and two generators. More than 50 networks connect, and VSIX also hosts the GARR research network node, the university's disaster recovery systems and a secondary data center for the Veneto Region.

Site History

  • 2023: VSIX opens the Cubo data center.
  • 2009: The University of Padova sets up VSIX.

Map and Nearby Locations

Galleria Spagna 28
VSIX Sites
Nearby Facilities

VSIX: Padova Power Growth Over Time

+100% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of VSIX: Padova

Distance Site About
0.42 miles Government Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
1.86 miles Noovle: Padova
Noovle runs one of the TIM Group's core data centers in the Camin industrial zone of Padua.
19.03 miles Rai Way: Venice Campalto
Rai Way's Venice edge data center sits at its Campalto broadcasting site on the mainland shore of the Venice lagoon.

Operating Company

Operated by:

VSIX, the Veneto System Internet eXchange, is run by the Università degli Studi di Padova through its Centro di Ateneo per la Connettività e i Servizi al Territorio. The university set it up in 2009 as a neutral access point and telehouse for north-eastern Italy. Martina Gianecchini is president and Luca Finotti is technical director.

VSIX operates two data centers in the Interporto area of Padua: a facility on the sixth floor of Galleria Spagna 28 and the Cubo building at Galleria Spagna 14, a two-storey building with a ground-floor data hall designed to be classified Tier III / Rated 3. It sells colocation and telehouse services to network operators, and hosts the university's disaster recovery, a node of the GARR research network and a Veneto Region disaster recovery site. The exchange connects 78 networks.

VSIX History:

  • In 2023, VSIX opened the Cubo data center at Galleria Spagna 14.
  • In 2020, the centre took its current name, Centro di Ateneo per la Connettività e i Servizi al Territorio VSIX.
  • In 2017, VSIX became an autonomous centre of the University of Padua.
  • Founded in 2009 in Padua.
0
Facilities
0
Markets

News See all

Read Poste Italiane Creates €600m Fund To Co-Finance Italian Data Centers
Poste Italiane has set up a €600 million ($665 million) co-investment fund to finance data centers in Italy. The company![datacenterdynamics.com](/rails/active_storage/representations/proxy/eyJfcmF...

Poste Italiane Creates €600m Fund To Co-Finance Italian Data Centers

November 13, 2026 Italy

Poste Italiane has set up a €600 million ($665 million) co-investment fund to finance data centers in Italy. The company disclosed the vehicle in its third-quarter 2026 results presentation on Nov. 12. Poste Italiane said the Bank of Italy approved the fund in September. The fund invests...

Read more
Read Milan Data Center Protest Draws Over 1,000 As Lombardy Plans Stricter Law
More than 1,000 people gathered in Piazza della Scala in Milan on Oct. 10 to oppose new data center construction in Lombardy, [Il Giorno](https://www.ilgiorno.it/milano/cronaca/data-center-protesta...

Milan Data Center Protest Draws Over 1,000 As Lombardy Plans Stricter Law

November 10, 2026 Milan

More than 1,000 people gathered in Piazza della Scala in Milan on Oct. 10 to oppose new data center construction in Lombardy, Il Giorno reported. The rally was the first national demonstration called by the National Network of Stop Data Center Committees. Organizers want the national government...

Read more
Read Council Rejects 80MW Data Center Proposal in Northern Italy
Cologno Monzese City Council in Lombardy, Italy, has unanimously rejected an 80MW data center proposed by Officine Mak and 2C Sviluppo Immobiliare Spa at the former Torriani industrial site. The pr...

Council Rejects 80MW Data Center Proposal in Northern Italy

October 11, 2026 Italy

Cologno Monzese City Council in Lombardy, Italy, has unanimously rejected an 80MW data center proposed by Officine Mak and 2C Sviluppo Immobiliare Spa at the former Torriani industrial site. The project, which was expected to generate €12 million ($13.4 million) in council fees, included two data...

Read more
Read IT Systems in Southern Italy Restored After Data Center Outage 
IT systems in Basilicata, southern Italy, have been restored after a data center outage between September 27 and 28. The regional government said its Central Reservation Center for healthcare servi...

IT Systems in Southern Italy Restored After Data Center Outage 

October 06, 2026 Italy

IT systems in Basilicata, southern Italy, have been restored after a data center outage between September 27 and 28. The regional government said its Central Reservation Center for healthcare services was back online on Wednesday. Technicians worked for several hours to restore the data center in...

Read more
Read 120MW Data Center Plans Withdrawn In Lombardy, Italy
Plans for a 120MW data center in Travagliato, Lombardy, have been withdrawn by developer East Gate, around 10 months after the project was submitted to the municipality. Mayor Renato Pasinetti conf...

120MW Data Center Plans Withdrawn In Lombardy, Italy

September 12, 2026 Italy

Plans for a 120MW data center in Travagliato, Lombardy, have been withdrawn by developer East Gate, around 10 months after the project was submitted to the municipality. Mayor Renato Pasinetti confirmed the withdrawal, saying the province of Brescia is expected to shelve the grid connection...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.