T-Systems Biere is the larger half of Deutsche Telekom's twin-core data center pair, with T-Systems Magdeburg about 20 km north as its twin. The campus sits on a fenced site at the edge of Biere and runs T Cloud Public (formerly Open Telekom Cloud) and other Telekom cloud services. It was built in two phases: Biere I with about 5,400 square meters of IT floor, and Biere II, three modules built by a Züblin and ENGIE Deutschland joint venture that raised capacity by 150 percent. The campus has 20 large IT rooms with space for about 100,000 servers.
A dedicated 110 kV substation on the east edge of the campus feeds the site. The data center holds Uptime Institute Tier III and EN 50600 availability class 3 certifications. The original masterplan allowed for up to 30,600 square meters of white space.
Site History
- July 2024: Telekom marked ten years of operation at Biere.
- September 2018: Biere II went into service.
- July 2014: Biere I opened together with the expanded Magdeburg twin.
- October 2012: The foundation stone was laid.