Pulsant: Cole Valley

Latest Podcast 20 Westwood Ave
Operational
Fully operational facility
Operated by:

Pulsant: Cole Valley

Ownership: Pulsant owns the building.
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

UK Edge data center firm Pulsant has acquired a Birmingham data center, known as the Cole Valley facility, from IT services provider SCC. The facility offers approximately 25,000 sq ft (2,320 sqm) of white space with expansion potential. SCC had previously installed solar panels on the site in 2023.

Map and Nearby Locations

20 Westwood Ave
Pulsant Sites
Nearby Facilities

Sites within 15 miles of Pulsant: Cole Valley

Distance Site About
2.07 miles Six Degrees: Birmingham Central
2.55 miles Intercity Birmingham
2.77 miles Level3 Birmingham UK
3.02 miles EBC Group: Birmingham
5.42 miles nLighten Edge 8 Birmingham
5.70 miles Atos: Birmingham
Located at 3300 Solihull Parkway, the Atos Birmingham Data Centre is a mission-critical infrastructure hub that has been operational since 1991.
7.18 miles ATOS: Longbridge
8.78 miles Datatech UK: Alvechurch
Located at Bordesley Hall, the Datatech UK Alvechurch facility is a purpose-built colocation center that officially opened in 2008.
10.31 miles VeloxServ: Velox 3, Redditch
Velox 3 in Redditch offers complete power protection boasting N+N UPS and Generator power infrastructure with dedicated fuel supply on-site and a 24/7/365 refueling contract in place.
12.06 miles Six Degrees: Studley North
12.08 miles Six Degrees: Studley South
The Studley South facility was commissioned in 1998.
12.28 miles Continuity House
Continuity House is the flagship, purpose-built data center for UK Dedicated Servers, opened in early 2023 to serve as a high-performance hub in the Midlands.
14.64 miles Level3 Wolverhampton
14.69 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Deep Green is building a data center in Wolverhampton, United Kingdom.
14.90 miles VeloxServ: Velox 2
14.91 miles VeloxServ: Velox 1, Wolverhampton
15.30 miles Kyndryl: Warwick

Pulsant: Cole Valley Data Center Photos See all

Operating Company

Operated by:
14
Facilities
7
Markets
21MW
Megawatts

News See all

Read SCC installs solar panels on its Birmingham data center
SCC installs solar panels on its Birmingham data center

SCC installs solar panels on its Birmingham data center

August 03, 2023 Birmingham UK

SCC has installed solar panels on its data center in Birmingham, it has announced. Its flagship CV1 facility will have a 737kWp roof-mounted solar-PV system attached that will cover just over five percent of the facility's total energy needs. This new development has been made possible in...

Read more
Read Antin Infrastructure Partners completes the acquisition of Pulsant
Antin Infrastructure Partners completes the acquisition of Pulsant

Antin Infrastructure Partners completes the acquisition of Pulsant

July 27, 2021 Pulsant

Antin Infrastructure Partners has completed the acquisition of UK data center firm Pulsant. Antin acquired Pulsant from Scottish Equity Partners and Oak Hill Capital who have owned the data center firm since 2014. None of the companies disclosed the terms of the deal. Pulsant operates 10 data...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?