Year Built: 2017
PUE: 1.26
Utility Provider: Pfalzwerke Netz
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

PFALZKOM opened its second Mutterstadt data center in March 2017. The building has four 650 sqm halls with room for up to 1,000 racks, and PFALZKOM fits them out one hall at a time. It uses Kyoto-wheel cooling with no raised floor.

Site History

  • March 2017: The data center opened with the first hall fitted out.

Source: PFALZKOM 2026 release

Map and Nearby Locations

In der Schlicht 4
PFALZKOM GmbH Sites
Nearby Facilities

PFALZKOM: DCRN II Mutterstadt Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of PFALZKOM: DCRN II Mutterstadt

Distance Site About
0.58 miles PFALZKOM: DCRN I Mutterstadt
PFALZKOM's first data center in Mutterstadt, a carrier-neutral colocation site in the Rhine-Neckar region with DE-CIX access.
2.02 miles WIIT: Limburgerhof LIM
WIIT's two colocation rooms, LIM 1 and LIM 2, in Limburgerhof near Ludwigshafen, formerly run by Lansol and myLoc.
4.84 miles TWL-KOM: Datacenter I Ludwigshafen
TWL-KOM's first Ludwigshafen data center, run by the telecom arm of Technische Werke Ludwigshafen at its head office.
5.52 miles TWL-KOM: Datacenter II Ludwigshafen
TWL-KOM's second Ludwigshafen data center, a TÜV availability class 4 colocation site on the Technische Werke Ludwigshafen grounds.
6.51 miles BASF: Ludwigshafen J650
BASF's J650 hub site and data center at the company's main works in Ludwigshafen, run by BASF Digital Solutions.
6.67 miles Education Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.24 miles euNetworks Mannheim
euNetworks' colocation site in Mannheim, which opened as a LambdaNet ColoCenter on LambdaNet's fibre network.
9.27 miles DATIS: Mannheim
DATIS IT-Services' data centre in Mannheim, offering colocation, edge data centre space and housing.
13.06 miles Heidelberg iT: Pfaffengrund
Heidelberg iT's data centre in the Pfaffengrund district, home of its Serverhotel 2 colocation offer.
14.61 miles nexspace: Heidelberg
nexspace's colocation data centre at the Heidelberg Innovation Park, opened in November 2023 and cooled by Stadtwerke Heidelberg's district cooling network.
14.61 miles Wirth Group: Philippsburg, Baden-Württemberg
Wirth Group's engrida data centre campus on the former Goodyear plant in Philippsburg, with a grid connection contracted at the 380 kV level of the former nuclear plant.
15.09 miles Heidelberg iT: The Wave House
The Wave House, a data centre with 3D-printed walls in Heidelberg run by Heidelberg iT, reported as Europe's largest 3D-printed building.
15.41 miles SAP: Walldorf WDF51
SAP's WDF51 data centre at its Walldorf headquarters, built in 2018 to add eight computer rooms to its St. Leon-Rot data centres.
18.02 miles SAP: St. Leon-Rot ROT06
SAP's ROT06 data centre in Building 6/16 at its St. Leon-Rot Service Center, one of the company's two data centres there, south of its Walldorf headquarters.
18.15 miles SAP: St. Leon-Rot ROT13
SAP's ROT13 data centre, a multi-storey IT building at its St. Leon-Rot Service Center and the larger of SAP's two data centres there.

Operating Company

Operated by:

PFALZKOM is a subsidiary of Pfalzwerke, the regional energy supplier for the Palatinate, and has its headquarters on Wredestraße in Ludwigshafen. It operated for years as Pfalzkom Manet. The company serves businesses in the Rhine-Neckar metropolitan region with fiber connectivity, colocation and managed services, and links its data centers to the DE-CIX internet exchange in Frankfurt. Its two data centers in Mutterstadt run on 100 percent green power, DCRN I since 2010 and DCRN II since 2017.

PFALZKOM History:

  • In July 2024, PFALZKOM agreed to sell its 40 percent stake in TWL-KOM to Technische Werke Ludwigshafen.
  • In March 2017, PFALZKOM opened its second Mutterstadt data center, DCRN II.
  • In 2010, PFALZKOM opened its first data center, DCRN I, in Mutterstadt.

Source: PFALZKOM 2026 release

0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.