E11: Building India’s Digital Backbone with Sharad Agarwal
Mar 12, 2026 Eric Bell World
Go to PodcastPFALZKOM, a subsidiary of the regional utility Pfalzwerke, opened its first data center in Mutterstadt in 2010. It has 700 sqm of server space for about 300 racks and offers DE-CIX access. Together with DCRN II nearby, it holds TÜV high-availability class 4 certification.
Source: enviaTEL Mutterstadt
| Distance | Site | About |
|---|---|---|
| 0.58 miles | PFALZKOM: DCRN II Mutterstadt |
PFALZKOM's second data center in Mutterstadt, a carrier-neutral colocation site in the Rhine-Neckar region opened in 2017.
|
| 1.51 miles | WIIT: Limburgerhof LIM |
WIIT's two colocation rooms, LIM 1 and LIM 2, in Limburgerhof near Ludwigshafen, formerly run by Lansol and myLoc.
|
| 4.27 miles | TWL-KOM: Datacenter I Ludwigshafen |
TWL-KOM's first Ludwigshafen data center, run by the telecom arm of Technische Werke Ludwigshafen at its head office.
|
| 4.97 miles | TWL-KOM: Datacenter II Ludwigshafen |
TWL-KOM's second Ludwigshafen data center, a TÜV availability class 4 colocation site on the Technische Werke Ludwigshafen grounds.
|
| 5.98 miles | BASF: Ludwigshafen J650 |
BASF's J650 hub site and data center at the company's main works in Ludwigshafen, run by BASF Digital Solutions.
|
| 6.10 miles | Education Data CenterInterested in this information?Contact us | Data center facility details are available on request.Interested in this information?Contact us |
| 6.69 miles | euNetworks Mannheim |
euNetworks' colocation site in Mannheim, which opened as a LambdaNet ColoCenter on LambdaNet's fibre network.
|
| 8.69 miles | DATIS: Mannheim |
DATIS IT-Services' data centre in Mannheim, offering colocation, edge data centre space and housing.
|
| 12.65 miles | Heidelberg iT: Pfaffengrund |
Heidelberg iT's data centre in the Pfaffengrund district, home of its Serverhotel 2 colocation offer.
|
| 14.21 miles | nexspace: Heidelberg |
nexspace's colocation data centre at the Heidelberg Innovation Park, opened in November 2023 and cooled by Stadtwerke Heidelberg's district cooling network.
|
| 14.71 miles | Heidelberg iT: The Wave House |
The Wave House, a data centre with 3D-printed walls in Heidelberg run by Heidelberg iT, reported as Europe's largest 3D-printed building.
|
| 14.80 miles | Wirth Group: Philippsburg, Baden-Württemberg |
Wirth Group's engrida data centre campus on the former Goodyear plant in Philippsburg, with a grid connection contracted at the 380 kV level of the former nuclear plant.
|
| 15.26 miles | SAP: Walldorf WDF51 |
SAP's WDF51 data centre at its Walldorf headquarters, built in 2018 to add eight computer rooms to its St. Leon-Rot data centres.
|
| 17.95 miles | SAP: St. Leon-Rot ROT06 |
SAP's ROT06 data centre in Building 6/16 at its St. Leon-Rot Service Center, one of the company's two data centres there, south of its Walldorf headquarters.
|
| 18.08 miles | SAP: St. Leon-Rot ROT13 |
SAP's ROT13 data centre, a multi-storey IT building at its St. Leon-Rot Service Center and the larger of SAP's two data centres there.
|
PFALZKOM is a subsidiary of Pfalzwerke, the regional energy supplier for the Palatinate, and has its headquarters on Wredestraße in Ludwigshafen. It operated for years as Pfalzkom Manet. The company serves businesses in the Rhine-Neckar metropolitan region with fiber connectivity, colocation and managed services, and links its data centers to the DE-CIX internet exchange in Frankfurt. Its two data centers in Mutterstadt run on 100 percent green power, DCRN I since 2010 and DCRN II since 2017.
Source: PFALZKOM 2026 release
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to PodcastTell us what you're looking for. We respond within one business day.