Northern Virginia

Northern Virginia Photos


Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
The lot currently has a 211,125-square-foot, two-story church, child care center, and
private school building.
150,000 square foot VA1 data center is an EPA's ENERGY STAR certified facility with 14.4 megawatts of high density critical IT power.
RagingWire has spent money to money to build in data center amenities and good aesthetics. The lobby of VA3 is no exception.
The 78-acre fenced campus can support up to 7 buildings with a total critical power load of 108 MW.
RagingWire plans 7 buildings on the campus. VA3, VA4, VA5, VA6, VA7, VA8, and VA9.
Suites available as of 2017
The inertia flywheel provides conditioned uninterrupted power to data center equipment
Ready for a customer deployment
The site was previously built and operated by Infomart before rebranding to STACK in January 2019.
Photo taken in September 2018
Satellite view of the Digital Realty Trust's new building and its proximity to Equinix Ashburn, and Cologix's new site
Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Entrance and Campus View
Posted in Equinix Culpeper Campus
The Christian Fellowship Church will be Converted into a Cologix Data Center
Posted in Cologix Ashburn ASH1
The lot currently has a 211,125-square-foot, two-story church, child care center, and
private school building.
Cologix Land Acquisition in Ashburn
Posted in Cologix Ashburn ASH1

The lot currently has a 211,125-square-foot, two-story church, child care center, and
private school building.

Source: Board of Supervisors
View of VA2 from the Entrance of VA1
Posted in CoreSite Reston Campus VA1 VA2
Conference Room in VA2
Posted in CoreSite Reston Campus VA1 VA2 Source: CoreSite
Lobby of VA2
Posted in CoreSite Reston Campus VA1 VA2 Source: CoreSite
150,000 square foot VA1 data center is an EPA's ENERGY STAR certified facility with 14.4 megawatts of high density critical IT power.
Layout Diagram of VA1 Building
Posted in RagingWire Ashburn VA1/VA2

150,000 square foot VA1 data center is an EPA's ENERGY STAR certified facility with 14.4 megawatts of high density critical IT power.

Source: RagingWire
Computer Room Inside VA1
Posted in RagingWire Ashburn VA1/VA2 Source: RagingWire
Aerial View of Digital Realty's Ashburn Campus
Posted in Digital Realty Loudoun Ashburn Campus
aerial view of the CyrusOne Sterling II Data Center Near Ashburn
Posted in CyrusOne Northern Virginia Sterling I, II, III Source: CyrusOne
CoreSite VA3 Under Construction
Posted in CoreSite Reston VA3 Source: CoreSite
The Manassas facility as construction was completing in February 2019
Posted in QTS Manassas
Drone shot of the facility on 9340 Godwin Drive
Posted in QTS Manassas
Exterior View
Posted in CloudHQ Manassas MCC1 Source: CloudHQ
RagingWire has spent money to money to build in data center amenities and good aesthetics. The lobby of VA3 is no exception.
Lobby of VA3
Posted in RagingWire Ashburn VA3

RagingWire has spent money to money to build in data center amenities and good aesthetics. The lobby of VA3 is no exception.

Source: RagingWire
The 78-acre fenced campus can support up to 7 buildings with a total critical power load of 108 MW.
Planned Ashburn Campus Building Layout
Posted in RagingWire Ashburn VA3

The 78-acre fenced campus can support up to 7 buildings with a total critical power load of 108 MW.

Source: RagingWire
RagingWire plans 7 buildings on the campus. VA3, VA4, VA5, VA6, VA7, VA8, and VA9.
Ashburn Campus Building Overview
Posted in RagingWire Ashburn VA3

RagingWire plans 7 buildings on the campus. VA3, VA4, VA5, VA6, VA7, VA8, and VA9.

Source: RagingWire
Equinix DC11 at Night
Posted in Equinix Ashburn Campus Source: Equinix
Equinix DC6
Posted in Equinix Ashburn Campus Source: PARADIGM
DC6 Under Construction
Posted in Equinix Ashburn Campus Source: PARADIGM
DC6 Under Construction
Posted in Equinix Ashburn Campus Source: PARADIGM
AWS Facility IAD-73
Posted in Amazon IAD-73
Satellite View Next to IAD74
Posted in Amazon IAD-73
Front Gate
Posted in COPT DC-6
Campus View
Posted in COPT DC-6
DC6 Substation Connections
Posted in COPT DC-6
Suites available as of 2017
DC6 Suites
Posted in COPT DC-6

Suites available as of 2017

Main Distribution Switchgear
Posted in COPT DC-6
The inertia flywheel provides conditioned uninterrupted power to data center equipment
HITEC Flywheel
Posted in COPT DC-6

The inertia flywheel provides conditioned uninterrupted power to data center equipment

Ready for a customer deployment
An Empty Data Hall
Posted in COPT DC-6

Ready for a customer deployment

Drone photo of the Ashburn-Moran facility
Posted in QTS Moran (The Vault) Source: QTS
Outside of "The Vault"
Posted in QTS Moran (The Vault) Source: QTS
AWS Facility IAD-74
Posted in Amazon IAD-74
The site was previously built and operated by Infomart before rebranding to STACK in January 2019.
STACK Ashburn Site Layout
Posted in STACK Northern Virginia

The site was previously built and operated by Infomart before rebranding to STACK in January 2019.

Source: Stack Infra
Artist Rendering of Infomart Ashburn
Posted in STACK Northern Virginia Source: Infomart Data Centers
Infomart Ashburn Lobby
Posted in STACK Northern Virginia Source: Infomart Data Centers
Under Construction at 22271 Broderick Drive in Ashburn
Posted in QTS Ashburn 1 Source: QTS
Site Plan Diagram of QTS's Ashburn 1 Site
Posted in QTS Ashburn 1 Source: QTS
Aerial View of QTS's Ashburn Data Center
Posted in QTS Ashburn 1
Pre-Construction Rendering of the Facility at 22271 Broderick Drive
Posted in QTS Ashburn 1
Photo taken in September 2018
First Ashburn Facility Under Construction
Posted in Vantage Ashburn

Photo taken in September 2018

Source: Vantage Data Centers
Planned 5 Building Campus
Posted in Vantage Ashburn
Rendering of one of the Ashburn Vantage data centers
Posted in Vantage Ashburn
Outside of Building J
Posted in 44100 Digital Loudoun Source: DRT
Location of Building J on Campus
Posted in 44100 Digital Loudoun Source: DRT
Outside of 1275 K Street - DC's Carrier Hotel
Posted in CoreSite DC1 - 1275 K Street NW
Entrance to CoreSite's DC1
Posted in CoreSite DC1 - 1275 K Street NW Source: CoreSite
424-Acre Lot to the West of Dulles Airport
Posted in Digital Realty Dulles Source: CBRE
MWAA Aerial View of 424-Acre Parcel
Posted in Digital Realty Dulles Source: Metropolitan Washington Airports Authority
IAD50, 60, and 71
Posted in Amazon IAD71
Proposed Campus Layout
Posted in CloudHQ Ashburn Campus
VA-1 Launch Event in September 2017
Posted in Iron Mountain Northern Virginia (Manassas) Source: WTOP
Satellite view of the Digital Realty Trust's new building and its proximity to Equinix Ashburn, and Cologix's new site
DRT Acquired 21780 Filigree in May 2019
Posted in 21780 Filigree: Digital Realty

Satellite view of the Digital Realty Trust's new building and its proximity to Equinix Ashburn, and Cologix's new site