Government Data CenterInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Prilep 7500, North Macedonia
OperationalProspective Expansion
Fully operational facility with prospective expansion planned
Operated by: Government OperatorInterested in this information?Contact us

Government Data Center

Year Built: 2022
Utility Provider: EVN Macedonia
Ownership: Government OperatorInterested in this information?Contact us owns the real estate.
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

The Ministry of Interior built this business continuity and disaster recovery data center on the northeastern edge of Prilep, next to the Mirče Acev barracks, to hold a second copy of its information systems. The circular building has two server rooms with space for 120 racks: 60 in the first phase, and 60 reserved for a later expansion. The government put the total cost at about EUR 11 million, of which the EU's IPA pre-accession program contributed EUR 3.4 million.

Other state institutions also store backup data at the center. Four had signed agreements by November 2023, and a fifth was in talks. The government plans a new primary National Data Center, with construction targeted for 2027, that will link to the Prilep center as its backup site.

Site History

  • In September 2026, the Minister of Digital Transformation said the planned National Data Center will connect to the backup infrastructure in Prilep.
  • In August 2026, Prime Minister Hristijan Mickoski described the Prilep center as the state's existing secondary, or recovery, data center.
  • In November 2023, Prime Minister Dimitar Kovachevski toured the center with Interior Minister Oliver Spasovski.
  • In September 2022, the Interior Minister said the ministry already ran most of its ICT systems redundantly at the Prilep center.
  • In 2019, construction of the building was completed.
  • In July 2018, Prime Minister Zoran Zaev and EU Ambassador Samuel Žbogar marked the start of construction.

Project Profile

  • Server rooms built as rooms within the room to the TIA-942 standard, on a 600 mm raised floor, with a design load of 7.2 kW per rack
  • Designed by 1X2STUDIO of Belgrade with MEGARON Engineering and SUEZ Consulting (SAFEGE)

Map and Nearby Locations

This Facility
Government OperatorInterested in this information?Contact us Sites
Nearby Facilities

Government Data CenterInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by: Government OperatorInterested in this information?Contact us
This operator's profile is available on request. Full company details, market presence, portfolio scale, and operating history are available to subscribers with unblurred access. Contact us to unlock the complete operator profile for this facility and every other location in their footprint.Interested in this information?Contact us
0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.