Hyperscale Data CenterInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Koropi 194 00, Greece
Under Construction
New facility under construction
Operated by:

Hyperscale Data Center

Year Planned: 2026

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

Hyperscale Data CenterInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Hyperscale Data CenterInterested in this information?Contact us

Distance Site About
0.05 miles Hyperscale Data CenterInterested in this information?Contact us
1.99 miles Data4: Athens ATH1
The €300 million ($331m) ATH1 site sits on 7.5 hectares. The first of two buildings is due to go live in early 2027.
2.04 miles Data4: ATH2
This facility is a part of Data4's Athens Campus in Paiania, near Athens, Greece.
2.38 miles TI Sparkle Koropi
Telecom Italia's subsidiary Sparkle's Koropi data center provides 2,580 square meters of built space.
3.42 miles Digital Realty: ATH4
Digital Realty's ATH4 is a new three-story facility with more than 3,000 sqm of white space in total buildout of 6,200 sqm.
3.43 miles Digital Realty: ATH5
Digital Realty plans to build the ATH5 data center in Athens, Greece, which will span 11,000 sqm.
3.44 miles Digital Realty: ATH3
ATH3, located in Koropi alongside ATH1 and ATH2, was part of Digital Realty’s expansion strategy in Greece following the acquisition of Lamda Helix in 2020.
3.46 miles Digital Realty: Athens ATH1
Digital Realty acquired this facility from Greek Data Center Firm Lamda Hellix in 2020.
3.47 miles Digital Realty: ATH2
Digital Realty acquired this facility from Greek Data Center Firm Lamda Hellix in 2020.
4.29 miles Apto: Spata
Apto, a data center development initiative backed by the investment groups Dromeus Capital of London and PIMCO of New York, intends to build a facility in Spata, near Athens International Airport.
4.48 miles Edgnex: Athens
The facility, located in the Attica region, is part of a joint venture named Data In Scale (DIS), formed between Edgnex’s parent company, DAMAC, and the PPC Group, an electricity utility.
5.82 miles Center MaxInterested in this information?Contact us
Microsoft's first Data Center in Greece is underway, with a €100 million (including VAT) construction contract covering all phases: studies, construction, and commissioning.
8.16 miles ServerFarm: Athens
IPTO of Greece and Serverfarm have entered into a Heads of Term agreement to form Gemini, a joint venture that will build and operate hyperscale-ready data centers.
8.77 miles Lancom: Athens
9.78 miles Eurobank: Athens IT Center
11.42 miles TI Sparkle: Metamorphosis II
The Metamorfosis II facility, situated in Athens near Metamorfosis I, encompasses approximately 6,000 square meters and offers a maximum capacity of 700 racks distributed across six modules.
11.43 miles TI Sparkle Metamorphosis
Telecom Italia's subsidiary Sparkle's Metamorfosis I data center provides 4,000 square meters of built space.

Hyperscale Data CenterInterested in this information?Contact us Data Center Photos See all

State of Azure Locations as of July 2019
Source: Microsoft
Conceptual Azure Regions and Availability Zones diagram
Source: Microsoft

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

426
Facilities
70
Markets

News See all

Read Microsoft Secures Capacity At Pure DC Data Center In Finland
Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW...

Microsoft Secures Capacity At Pure DC Data Center In Finland

July 14, 2026 Microsoft Azure

Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW of capacity with an estimated investment of $1.7 billion. Pure DC has been developing plans for the...

Read more
Read Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion
Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. T...

Microsoft Reports 25% Rise in CO₂ Emissions Amid Data Center Expansion

July 10, 2026 Microsoft Azure

Microsoft reported a 25 percent year-on-year rise in carbon emissions, with total Scope 1, 2, and 3 emissions increasing to 20.29 million metric tons of CO₂e as data center expansion accelerated. The company said the jump was largely due to its decision to stop using unbundled renewable energy...

Read more
Read National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center
National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The i...

National Grid Ventures Invests $1.75bn in Gas Plant for Microsoft Texas Data Center

July 04, 2026 Microsoft Azure

National Grid Ventures (NGV), the commercial arm of National Grid, has acquired a 35% stake in Joulent for $1.75 billion to support development of power infrastructure for large data centers. The investment will help fund Project Kilby, a 2.67GW natural gas facility being developed with Chevron....

Read more
Read Microsoft’s First Data Center at Mount Pleasant, Wisconsin Campus Now Operational
The first data center at Microsoft’s Mount Pleasant, Wisconsin campus is now officially operational, the company confirmed on June 23. Construction was completed just over two years after the proje...

Microsoft’s First Data Center at Mount Pleasant, Wisconsin Campus Now Operational

June 23, 2026 Microsoft Azure

The first data center at Microsoft’s Mount Pleasant, Wisconsin campus is now officially operational, the company confirmed on June 23. Construction was completed just over two years after the project was first announced. The site is part of Microsoft’s “Fairwater” data center design and will form...

Read more
Read Microsoft Begins Construction of La Porte Data Center Campus
Microsoft has broken ground on a new data center campus in La Porte, Indiana. Brad Smith, Microsoft vice chair and president, announced in a LinkedIn post that the groundbreaking ceremony took plac...

Microsoft Begins Construction of La Porte Data Center Campus

June 18, 2026 Microsoft Azure

Microsoft has broken ground on a new data center campus in La Porte, Indiana. Brad Smith, Microsoft vice chair and president, announced in a LinkedIn post that the groundbreaking ceremony took place on June 17. Smith wrote: "Today we broke ground in La Porte, Indiana, alongside Mayor Tom Dermody,...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?