E11: Building India’s Digital Backbone with Sharad Agarwal
Mar 12, 2026 Eric Bell World
Go to PodcastIn 2025, the UK renewable energy firm Energy OperatorInterested in this information?Contact us submitted proposals for a portfolio of ten data centre projects as part of NESO’s Gate 2 grid-connection queue process, including the Feckenham project. Expected grid connection dates across the portfolio were indicated to be 2029–2032.
| Distance | Site | About |
|---|---|---|
| NN milesInterested in this information?Contact us | Six Degrees: Studley South |
The Studley South facility was commissioned in 1998.
|
| NN milesInterested in this information?Contact us | Six Degrees: Studley North |
|
| NN milesInterested in this information?Contact us | VeloxServ: Velox 3, Redditch |
Velox 3 in Redditch offers complete power protection boasting N+N UPS and Generator power infrastructure with dedicated fuel supply on-site and a 24/7/365 refueling contract in place.
|
| NN milesInterested in this information?Contact us | Datatech UK: Alvechurch |
Located at Bordesley Hall, the Datatech UK Alvechurch facility is a purpose-built colocation center that officially opened in 2008.
|
| NN milesInterested in this information?Contact us | ATOS: Longbridge | |
| NN milesInterested in this information?Contact us | Pulsant: Cole Valley |
UK Edge data center firm Pulsant has acquired a Birmingham data center, known as the Cole Valley facility, from IT services provider SCC.
|
| NN milesInterested in this information?Contact us | Intercity Birmingham | |
| NN milesInterested in this information?Contact us | Kyndryl: Warwick |
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to Podcast