Go to PodcastHetzner Online's Falkenstein park holds 24 data center units. Each unit has N+1 UPS, its own 2.5 MVA standby generator and two separate power paths from the substation beside the park, and the halls run on free cooling. Hetzner owns farmland west of the built area, and a 2024 zoning amendment added about 10 hectares to the industrial area for more halls. The zoning plan also proposes using the park's waste heat for a local heating line.