Grupo Aire OASIX: Malaga

Year Built: 2022
░░░ Request Dataset MW
Operational Power
░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

The Grupo Aire OASIX Malaga data center, operational since 2022, spans over 400 m² and houses more than 74 racks.

Map and Nearby Locations

C. Rosalind Franklin ( Campanillas )
Oasix | Grupo Aire Sites
Nearby Facilities

Grupo Aire OASIX: Malaga Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Grupo Aire OASIX: Malaga

Distance Site About
3.80 miles DataRush: Malaga 2
4.07 miles Box2bit: Malaga
Box2bit facility, spanning 15,000 square meters (161,460 sq ft), will be located on Calle Canadá in Malaga's El Viso industrial area.
4.28 miles DataRush: Malaga 1
4.74 miles Templus: Malaga
In 2024, Templus enhanced its Malaga data center with the introduction of a new data room, CPD3, which houses 40 racks.
6.25 miles Málaga Data Center

Operating Company

Operated by:
0
Facilities
0
Markets
0MW
Megawatts

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.