Fujitsu Noble Park

Latest Podcast 5 Summit Rd
Operational
Fully operational facility
Operated by:

Fujitsu Noble Park

Year Built: 1988
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Architecture


  • Purpose built data centre, constructed in 1988
  • Soley owned by Fujitsu Australia
  • 1:100 natural disaster event resilience
  • 2-hour fire rating on all data hall doors walls
  • Absence of external windows and signage

Dimensions


  • Land 18,400m2
  • Building 6,700m2
  • Raised data halls 3,800m2
  • Plant and equipment area 3,500m2
  • Office area, work area and amenities 885m2
  • Parking area for up to 50 vehicles

Electrical System


  • 2 x 4MVA main feeds via diverse entry points and pathways
  • 2 x 1800KW Diesel Rotary UPS in N+1 configuration
  • On-site fuel storage sufficient for 72 hours non-stop operations
  • Power allocation design of minimum 1000
  • 2400KW of Static UPS
  • 3 x 1800KW backup generators with N+1 configuration

Telecommunications


  • Carrier-neutrality
  • 2 diverse under-ground cable pathways to the building

Data Hall


  • Minimum 600mm raised floor
  • Floor rating to 1400kg per m load
  • Floor tile system resistant to Zinc whiskers
  • Earthing system

Certifications


  • ISO-27001 Information Systems Security Management

Map and Nearby Locations

5 Summit Rd
Fujitsu Sites
Nearby Facilities

Sites within 15 miles of Fujitsu Noble Park

Distance Site About
3.45 miles Telstra: Clayton Campus
In 2021, Australian telco Telstra converted two of its own-use data centers into carrier-neutral colocation facilities.
3.47 miles Centuria: Clayton 1
CIP acquired the Telstra data centre campus in Clayton, Melbourne, in 2020 through a sale leaseback for about A$417 million.
3.51 miles Centuria: Clayton 2
Centuria Industrial REIT is planning to build a high-capacity, AI-ready facility at its industrial campus in Melbourne's southeast.
8.76 miles Vocus: MEL04
Vocus acquired this facility from Enterprise Data Corporation (EDC) in February 2015.
11.26 miles Micron21: Melbourne
Micron21, located in Melbourne's outer east, is Australia's first data centre with Uptime Institute Tier IV Fault Tolerant Design Certification.
12.74 miles Galileo Group: Melbourne Campus
Real estate investment and funds management firm Galileo Group owns the 53.6-hectare site at 585 Berwick-Cranbourne Road in Clyde North, Victoria.
15.13 miles Telstra: Exhibition
The Exhibition data center is located in Melbourne's CBD. It's one of two Telstra InfraCo data centers in Melbourne. The facility offers colocation services and is connected to its counterpart via fiber networks.
15.23 miles ADC: Melbourne campus
Australian Data Centres (ADC) is planning an AI-optimised campus in Melbourne.
15.31 miles Vocus Melbourne (55 King) [Site Closed]
15.37 miles MDC 530 Collins
15.37 miles Vocus: MEL03
VDC-MEL03 data center is located at 530 Collins Street in Melbourne. The company moved into the former ASX building in 2013 and said at the time it could build out to 400 racks.
15.79 miles Interactive Melbourne
15.91 miles Equinix ME5
The company acquired from Metronode in 2018.
16.30 miles NEXTDC: M1 Melbourne
NEXTDC's M1 facility is the best-connected data centre in Melbourne and is certified to UTI Tier III standard.
17.06 miles Equinix Melbourne ME1
17.10 miles Equinix Melbourne ME2
17.12 miles NEXTDC: M4 Melbourne
This Tier IV data center will encompass 50,000 square meters and include an AI Factory.
18.15 miles GreenSquare: Melbourne Campus
Australian data center firm GreenSquare is expanding into Melbourne with plans for a new hyperscale campus, designated as MEL1, located on a former petrochemical storage site in Spotswood.
19.79 miles AlphaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.90 miles Centuria: Yarraville
Centuria Industrial REIT acquired the warehouse site at 1 Hardie Road and 2-8 Cawley Road, Yarraville, in late 2025 for A$30.2 million.
19.90 miles West HubInterested in this information?Contact us

Fujitsu Noble Park Data Center Photos See all

The Noble Park Data Centre attained a four-star certification from the National Australian Built Environment Rating System (NABERS).
Noble Park is a NABERS Certified Facility
Source: Baxtel

The Noble Park Data Centre attained a four-star certification from the National Australian Built Environment Rating System (NABERS).

Operating Company

Operated by:
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read AirTrunk Confirms Operator Role for Seven-Building Mickleham Campus
[AirTrunk](https://baxtel.com/data-centers/airtrunk) plans a seven-building data center campus at Mickleham, about 35km north of central [Melbourne](https://baxtel.com/regions/melbourne). The compa...

AirTrunk Confirms Operator Role for Seven-Building Mickleham Campus

November 09, 2026 AirTrunk

AirTrunk plans a seven-building data center campus at Mickleham, about 35km north of central Melbourne. The company said in a 9 November statement that it is advancing the proposal at 45 Donnybrook Road and named itself as the operator behind the project, after the applicant went unnamed in the...

Read more
Read Goodman and Digital Realty Launch A$715M Bid for 9.9% NEXTDC Stake
[Goodman Group](https://baxtel.com/data-centers/goodman-group) and [Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) moved to buy up to 9.9% of Australian operator [NEXTDC](htt...

Goodman and Digital Realty Launch A$715M Bid for 9.9% NEXTDC Stake

November 05, 2026 NEXTDC

Goodman Group and Digital Realty moved to buy up to 9.9% of Australian operator NEXTDC at a 45.5% premium to the previous close. The buyers offered A$9.50 a share through an aftermarket bookbuild, a purchase Reuters valued at about A$715 million (US$501 million) after reviewing the term sheet....

Read more
Read HyperDC Files Plans for 400MW Data Center Campus West of Melbourne
HyperDC Pty Ltd has filed a planning permit application for a 400MW data center campus at 715 Ballan Road in Moorabool, about 75 kilometres west of [Melbourne](https://baxtel.com/regions/melbourne)...

HyperDC Files Plans for 400MW Data Center Campus West of Melbourne

September 29, 2026 Melbourne

HyperDC Pty Ltd has filed a planning permit application for a 400MW data center campus at 715 Ballan Road in Moorabool, about 75 kilometres west of Melbourne, as reported by Data Center Dynamics. The developer's website lists the 39-hectare parcel as MBL1 and states an intention to build...

Read more
Read Fujitsu Sells Australian Data Center Business to Next Capital
Fujitsu has agreed to sell its Australian data center business to private equity firm Next Capital. The deal includes five data centers totaling 25MW of capacity, with room to expand to 100MW. Fina...

Fujitsu Sells Australian Data Center Business to Next Capital

July 20, 2026 Fujitsu

Fujitsu has agreed to sell its Australian data center business to private equity firm Next Capital. The deal includes five data centers totaling 25MW of capacity, with room to expand to 100MW. Financial terms were not disclosed, and Fujitsu said operations will continue as normal until the...

Read more
Read Fujitsu closes US data centers operations, might follow suit in South America
Fujitsu closes US data centers operations, might follow suit in South America

Fujitsu closes US data centers operations, might follow suit in South America

September 13, 2023 Fujitsu

Fujitsu is revising its data center approach to the Americas and has shut down its data center operation in North America. Fujitsu's newly hired CEO for the Americas, Asif Poonja, stated in an interview with BNAmericas this week that the company is contemplating partnering with service...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.