E11: Building India’s Digital Backbone with Sharad Agarwal
Mar 12, 2026 Eric Bell World
Go to PodcastData Center Bełchatów Sp. z o.o., owned 60% by Exus Digital and 40% by NEXT DC, holds grid connection conditions from PSE at the Rogowiec 400 kV substation and has applied to PGE Dystrybucja for more capacity. Gmina Bełchatów adopted a local plan in September 2026 for a 50 ha economic zone south of Domiechowice and west of the Bełchatów bypass that allows data centers. Local press describes up to 18 buildings on about 100 ha, with construction from mid-2028 and the first buildings in 2029 or 2030. Residents filed 25 formal objections to the plan, and the environmental decision is pending.
Exus Digital belongs to Exus, a Lisbon-based renewable energy developer and asset manager formerly known as Exus Renewables, which entered Poland with wind projects in 2024. Exus Digital develops large-scale digital infrastructure sites built around secured power, and reports a pipeline of 6.2 GW.
In Poland it holds 60% of Data Center Bełchatów Sp. z o.o., with NEXT DC holding 40%, which plans a data center campus at Domiechowice near Bełchatów.
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to PodcastTell us what you're looking for. We respond within one business day.