Era4: Derbyshire

Latest Podcast Erin Landfill
OperationalPlanned
Operational with future phases planned
Operated by:

Era4: Derbyshire

Year Built: 2026
Utility Provider: National Grid Electricity Distribution
░░░ Request Dataset MW
Operational Power

Era4, which was incorporated as Carbon3.ai and rebranded in March 2026, built this modular AI data centre beside Valencia Energy's Erin landfill energy centre in Duckmanton, Derbyshire, with the grid as backup. Chesterfield Borough Council granted planning permission in November 2025 for up to five modular data centre pods with associated equipment, staff accommodation and fencing. The site uses HPE AI Mod Pod units with Nvidia B300 hardware.

The facility was live by October 2026. In November 2026 Fireworks AI contracted the site's full capacity of liquid-cooled Nvidia Blackwell Ultra compute under a multi-year agreement, with Era4 owning and operating the site.

Site History

  • November 2026: Fireworks AI contracts the site's full capacity.
  • October 2026: The facility is reported live.
  • March 2026: Carbon3.ai rebrands as Era4.
  • November 2025: Chesterfield Borough Council grants planning permission for up to five modular pods.

Map and Nearby Locations

Erin Landfill ( Markham Ln, Duckmanton )
Era4 Sites
Nearby Facilities

Era4: Derbyshire Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Era4: Derbyshire

Distance Site
5.62 miles HA Hosting: Sheffield
10.50 miles BT: Sheffield Cutler
10.91 miles ASK4 DC1 - Sheffield
12.32 miles Harworth: Nottinghamshire, UK
12.49 miles Parseq: Rotherham
12.87 miles Portal Group: Nottinghamshire, UK
17.24 miles Pulsant: Rotherham YH-1
17.66 miles nLighten Edge 1 Nottingham
19.31 miles Space Data Centres: Nottingham

Era4: Derbyshire Data Center Photos See all

Rendering of Carbon3's proposed data center in Derbyshire
Source: Carbon3.ai

Operating Company

Operated by:

Era4 (formerly Carbon3.ai) is building the UK’s sovereign, secure, and sustainable AI platform. Vertically integrated to bypass grid constraints, the company transforms legacy industrial sites into high-performance, lower-carbon AI data hubs powered by independent, off-grid energy sources.

All data processing and infrastructure remain strictly within UK jurisdiction. Operating over 40 nationwide sites, Era4 deploys high-density, liquid-cooled architectures equipped with NVIDIA HGX B-series chips. Backed by partnerships with technology leaders like HPE, WWT, and Civo, Era4 provides low-latency, scalable AI compute to secure the UK's sovereign digital future.

0
Facilities
0
Markets

News See all

Read Era4 Reveals 1GW Newport AI Campus With 400,000-GPU Target
Era4 has released details of [The Mill](https://era4.com/the-mill), an AI campus on a former steelworks in Newport, South Wales, designed to reach 1GW of power at full build-out. The campus has r![...

Era4 Reveals 1GW Newport AI Campus With 400,000-GPU Target

October 22, 2026 Era4

Era4 has released details of The Mill, an AI campus on a former steelworks in Newport, South Wales, designed to reach 1GW of power at full build-out. The campus has room for the equivalent of up to 400,000 Nvidia VR200 GPUs, and the first phase is due online in 2027. Data Center Dynamics reported...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.