EDF: Cottam

Latest Podcast Cottam Power Station, Outgang Lane
Land Bank
Land secured for future development
Operated by:

EDF: Cottam

Year Planned: 2031
Utility Provider: National Grid Electricity Transmission
Lot Size: 900 acres

EDF, which owns the former Cottam power station site, signed a memorandum of understanding with Holtec International and Tritax in September 2025 to develop a data centre campus of up to 1 GW on the land. The coal-fired station closed in 2019. The campus would run first on grid and renewable power, with Holtec SMR-300 small modular reactors added on the site in the 2030s. Tritax is the real estate partner and will find the tenant.

NESO describes the campus as two phases, with grid connection from the early 2030s. In June 2026 Holtec and EDF proposed up to four SMR-300 reactors at Cottam and signed heads of terms for a joint venture. The site is part of the Trent Valley AI Growth Zone bid led by the East Midlands Combined County Authority. No planning application has been made.

Site History

  • June 2026: Holtec and EDF propose up to four SMR-300 reactors at Cottam and sign joint venture heads of terms.
  • September 2025: EDF, Holtec and Tritax announce plans for a data centre campus at Cottam.
  • 2019: Cottam power station closes.

Map and Nearby Locations

Cottam Power Station, Outgang Lane
Électricité de France (EDF) Sites
Nearby Facilities

EDF: Cottam Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of EDF: Cottam

Distance Site
3.89 miles Government Data CenterInterested in this information?Contact us
11.15 miles Deep Green: Lincoln
15.62 miles Digital Space: Newark
18.24 miles Harworth: Nottinghamshire, UK

Operating Company

Operated by:

Électricité de France (EDF) is a French electric utility wholly owned by the French state, which completed its renationalisation in June 2023; its shares were delisted from Euronext Paris that year. EDF was created by a nationalisation law in April 1946 and is headquartered at 22-30 avenue de Wagram in Paris. The group generates, distributes, trades and sells electricity, and operates the French nuclear fleet alongside hydropower, wind and solar assets. Its subsidiaries include Enedis, Dalkia, Edison and EDF Energy. EDF reported 2025 sales of €113.3 billion. In the data center market, EDF supplies low-carbon electricity to operators, makes land at former power plant sites available for data center development, and leases space in its own data centers at Val-de-Reuil and Pacy-sur-Eure in Normandy.

EDF History:

  • In November 2025, EDF and OpCore agreed to develop a data center on the site of a former thermal power plant in Montereau-Vallée-de-la-Seine, in the wider Paris region.
  • In September 2025, Data4 signed an agreement with EDF for low-carbon electricity supply to its data centers in France.
  • In November 2024, EDF launched Datacenter & Territoires, an offer that hosts customer IT equipment in its data centers in Normandy.
  • In June 2023, the French state completed the full renationalisation of EDF.
  • Founded in 1946 in Paris.
0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.