Carrier-Neutral Data CenterInterested in this information?Contact us

Latest Podcast Bhola Nagar
OperationalPlanned
Operational with future phases planned
Operated by:

Carrier-Neutral Data Center

Short Code: BOM1
Year Built: 2025
PUE: 1.25
Utility Provider: Hexa Climate Solutions Pvt
Lot Size: 47 acres

Sites on this Campus:

  • Carrier-Neutral Data CenterInterested in this information?Contact us
  • Carrier-Neutral Data CenterInterested in this information?Contact us
░░░░ Request Dataset MW
Total Power

APAC data center operator Digital Edge is building its Navi Mumbai campus in India. The 47-acre site is the company’s first data center project in India, representing a total investment of $2 billion. The first phase, dubbed BOM1, was completed in Q4 2025, with the rest of the campus expected to be developed in later phases.

Plans for the campus were first announced in January 2023, when Digital Edge partnered with the National Investment and Infrastructure Fund (NIIF) and AGP DC InvestCo Pte Ltd to develop a pan-Indian data center portfolio.

Map and Nearby Locations

Bhola Nagar
Digital Edge DC Sites
Nearby Facilities

Carrier-Neutral Data CenterInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Carrier-Neutral Data CenterInterested in this information?Contact us

Distance Site About
0.11 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Digital Edge's Navi Mumbai Campus in India.
0.19 miles Carrier-Neutral Data CenterInterested in this information?Contact us
This facility is part of Digital Edge's Navi Mumbai Campus in India.
0.63 miles NTT: NAV 2
Spread over 54 acres in Navi Mumbai, the company will build four data centers in phase 1. Overall, its proposed capacity will be developed in multiple phases in the medium to long term.
0.79 miles Campus BetaInterested in this information?Contact us
0.82 miles Equinix MB4
0.96 miles CapitaLand: Navi Mumbai 2
The Data center building is a part of CapitaLand's Navi Mumbai Campus in India. The 6.6-acre greenfield site will be developed in phases up to 575,000 sq ft (53,400 sqm).
0.99 miles CapitaLand: Navi Mumbai 1
The campus will comprise two buildings; the first building comprises 325,000 sq ft.
1.10 miles Colt: MUM1 DC6
The planned facility is part of Colt's Mumbai Campus in Digha, Navi Mumbai. Located in an industrial zone, the facility is positioned on the eastern side of the Thane Belapur road.
1.12 miles Colt: MUM1 DC5
The planned facility is part of Colt's Mumbai Campus in Digha, Navi Mumbai. Located in an industrial zone, the facility is positioned on the eastern side of the Thane Belapur road.
1.13 miles Colt: MUM1 DC4
The planned facility is part of Colt's Mumbai Campus in Digha, Navi Mumbai. Located in an industrial zone, the facility is positioned on the eastern side of the Thane Belapur road.
1.13 miles Colt: MUM1 DC2
The facility is part of Colt's Mumbai Campus in Digha, Navi Mumbai. Located in an industrial zone, the facility is positioned on the eastern side of the Thane Belapur road.
1.14 miles Colt: MUM1 DC3
The planned facility is part of Colt's Mumbai Campus in Digha, Navi Mumbai. Located in an industrial zone, the facility is positioned on the eastern side of the Thane Belapur road.
1.17 miles Colt Mumbai
In 2023, Colt DCS completed the first phase development of one of the largest data centres for Colt, a 120MW data centre offering a gross site area of 62,000m2 located in Navi Mumbai.
1.27 miles Princeton: MU1 DC4
This data center is a part of Princeton Digital Group's (PDG) MU1 Campus in Navi Mumbai.
1.28 miles Princeton: MU1 DC5
This data center is a part of Princeton Digital Group's (PDG) MU1 Campus in Navi Mumbai.
1.31 miles Princeton PDG MU1
PDG's MU1 data center campus is taking shape in the heart of Navi Mumbai's tech corridor. Set within a planned 50-acre IT park in Airoli, this state-of-the-art facility will feature five purpose-built data centers.
1.34 miles ESDS: Airoli DC
ESDS launched its data center facility in Airoli, Mumbai, in 2023. It is the second ESDS data center in Mumbai, and operations commenced with plans to migrate clients from their older Mahape data center.
1.34 miles Princeton: MU1 DC2
This data center is a part of Princeton Digital Group's (PDG) MU1 Campus in Navi Mumbai.
1.40 miles Princeton: MU1 DC3
This data center is a part of Princeton Digital Group's (PDG) MU1 Campus in Navi Mumbai.
1.43 miles Sify: Mumbai 02 Airoli
Sify's data center in Airoli has space for 1,345 racks. The Airoli Data Center interconnects with Sify's Rabale Data Center and provides access to hyperscale public clouds with very low to sub-millisecond latency.
1.47 miles Gramercy Techpark Mumbai
Gramercy Techpark is developing a data center campus in the TTC Industrial Area, Airoli, Navi Mumbai, Maharashtra.
1.51 miles TowerInterested in this information?Contact us
Amazon Data Services Pvt Ltd has sub-leased 4.51 lakh sq ft of plot in TTC industrial area in Bonsari in Airoli for a period of 15 years (starting in August 2023.)
2.31 miles East PointInterested in this information?Contact us
In late 2022, Amazon Data Services completed the acquisition of a 54-acre land parcel in Thane from the Kalpataru Group for Rs 1,870 crore.
2.89 miles Sify: Rabale DC3
This data center building is a part of Sify's Mumbai 03 Rabale Campus in Navi Mumbai.
2.94 miles Sify: Rabale DC2
This data center building is a part of Sify's Mumbai 03 Rabale Campus in Navi Mumbai.
2.95 miles Sify: Rabale DC9
This data center building is a part of Sify's Mumbai 03 Rabale Campus in Navi Mumbai.
2.97 miles Sify: Mumbai 03 Rabale
Sify's Rabale data center campus in Navi Mumbai is designed for 12 towers, powered by dedicated 110 KV (towers 1-3) and 220 KV GIS (towers 4-6) substations.
3.02 miles Sify: Rabale DC5
This data center building is a part of Sify's Mumbai 03 Rabale Campus in Navi Mumbai.
3.03 miles Sify: Rabale DC4
This data center building is a part of Sify's Mumbai 03 Rabale Campus in Navi Mumbai.
3.04 miles Sify: Rabale DC11
This data center building is a part of Sify's Mumbai 03 Rabale Campus in Navi Mumbai.
3.08 miles Sify: Rabale DC6
This data center building is a part of Sify's Mumbai 03 Rabale Campus in Navi Mumbai.
3.08 miles Sify: Rabale DC12
This data center building is a part of Sify's Mumbai 03 Rabale Campus in Navi Mumbai.
3.08 miles ESR Group: Rabale MU1
ESR is developing the Rabale MU1 Data Centre in Navi Mumbai as its first Indian data center project. Located within the Airoli–Rabale digital infrastructure cluster, the facility has been fully pre-leased and is designed to support large-scale cloud, AI, and enterprise deployments.
3.09 miles Sify: Rabale DC10
This data center building is a part of Sify's Mumbai 03 Rabale Campus in Navi Mumbai.
3.10 miles Sify: Rabale DC7
This data center building is a part of Sify's Mumbai 03 Rabale Campus in Navi Mumbai.
3.12 miles Sify: Rabale DC8
This data center building is a part of Sify's Mumbai 03 Rabale Campus in Navi Mumbai.
3.29 miles Princeton PDG MU2
Princeton Digital Group has begun construction on its MU2 data center campus in Navi Mumbai, Maharashtra, within the city’s primary data center corridor. The project is a new hyperscale facility on a 10-acre site, with construction starting in April 2026 following recent land acquisition.
3.33 miles Iron Mountain: Mumbai 1
The facility has over 50,000 square ft. of floor space, 800 racks, and an SAP certified infrastructure, and many more features.
3.36 miles Iron Mountain: Mumbai 2
The facility spanning 120,000 sq ft (11,150 sqm), is designed to a 'Tier III standard,' and was built in partnership with Iron Mountain Data Center.
4.15 miles Pi Datacenters: Mumbai
Pi Data Centers is entering the Mumbai market through development of a phased Central Mumbai data center deployment. The project begins with an initial launch scheduled for August 2026 and is intended to scale into a larger AI-ready digital infrastructure platform over time.
4.28 miles Brookfield (BIP): Navi Mumbai
4.99 miles STT Mumbai 4
5.01 miles AdaniConneX Mumbai
5.15 miles Carrier-Neutral Data CenterInterested in this information?Contact us
L&T Cloudfiniti, the data center arm of the L&T conglomerate, plans to invest up to Rs 3,600 crore (~US$415 million) in India to construct three new data centers, including NMP2 in Mahape near Mumbai.
5.43 miles STT: Navi Mumbai Mahape
STT GDC India has acquired a former Repro India industrial property in Navi Mumbai’s TTC/MIDC industrial area. The site appears to be a future data center land bank or expansion parcel, but STT has not yet announced a named facility, capacity, design, construction start, or delivery timeline.
5.44 miles Silvernox: Navi Mumbai
5.66 miles Reliance DAKC Mumbai IDC-1
5.66 miles Reliance DAKC Mumbai IDC-5
5.66 miles Reliance DAKC Mumbai IDC-3
5.67 miles CtrlS: Mumbai Expansion
CtrlS plans to expand its Mumbai Campus with the addition of four new data center buildings: DC10, DC11, DC12, and DC13.
5.67 miles CtrlS: Mumbai DC3
This data center is a part of CtrlS' Mumbai Campus in Navi mumbai.
5.70 miles CtrlS: Mumbai DC6
This facility is part of CtrlS's Navi Mumbai Campus in India.
5.73 miles CtrlS: Mumbai DC4
This data center is part of CtrlS' Mumbai Campus in Navi Mumbai. The facility has 2,936 racks, is built to Rated-4 standards, and covers 265,000 square feet.
5.74 miles CtrlS: Mumbai DC9
This facility is part of CtrlS's Navi Mumbai Campus in India.
5.75 miles CtrlS: Mumbai DC7
This facility is part of CtrlS's Navi Mumbai Campus in India.
5.75 miles CtrlS: Mumbai Campus
CtrlS is building a massive data center campus in Mumbai, with plans to expand up to 13 buildings and covering over 3 million square feet.
5.76 miles CtrlS: Mumbai DC2
DC2 is part of CtrlS's Mumbai data center campus, launched in 2019, spanning 132,000 square feet (12,260 square meters) of space.
5.76 miles Iron Mountain: Mumbai 3
Iron Mountain has broken ground on its third data center facility in Mumbai, situated in the Rabale locality within the MIDC Industrial Area.
5.77 miles CtrlS: Mumbai DC5
This data center is part of CtrlS' Mumbai Campus in Navi Mumbai. The facility has 2,750 racks, is built to Rated-4 standards, and covers 228,482 square feet.
5.78 miles CtrlS: Mumbai DC8
This facility is part of CtrlS's Navi Mumbai Campus in India.
5.83 miles STT: Navi Mumbai 3
This facility will be part of STT GDC's Navi Mumbai Campus in Maharashtra, India.
5.88 miles STT Navi Mumbai 1
As part of STT GDC India's multi-megawatt capacity expansion plan, the latest Navi Mumbai campus located in MIDC Mahape, Navi Mumbai features three data centres.
5.89 miles Reliance DAKC Mumbai IDC-2
5.90 miles STT Navi Mumbai 2
This facility will be part of STT GDC's Navi Mumbai Campus in Maharashtra, India.
6.08 miles NTT: NAV1B
This data center is a part of NTT's Mhape campus in Navi Mumbai.
6.09 miles ESDS: Mumbai DC
This facility is spread over 80,000 sq. ft. of building space.
6.11 miles NTT NAV1A
NTT's Navi Mumbai Data Center (NAV1A) is the first facility on the company's second hyperscale data center campus in India. Spread across 37,000m², it has the capacity to host 5,000 racks.
6.24 miles Nxtra: Mumbai III
Nxtra Data is building a Hyperscale park with 600,000 sq ft built-up area spread across 3 towers in Navi Mumbai.
6.73 miles Yotta: Powai, Mumbai
Yotta Infrastructure is building a new data center park on 7.7 hectares (approximately 19 acres) in the Powai area of Maharashtra in Mumbai, India. The project comprises two buildings.
7.39 miles West PlazaInterested in this information?Contact us
Amazon Data Services has finalized the purchase of a 38-acre land parcel in the Shilphata region from Macrotech Developers (Lodha Group) for ₹450 crore.
7.97 miles NTT Vikhroli Phase IV
8.43 miles Ridge OneInterested in this information?Contact us
Amazon Web Services (AWS) is developing a data center facility near Taloja, Navi Mumbai, following a $429.8 million investment.
8.51 miles PlusInterested in this information?Contact us
The Amazon Data Services (AWS) data center in Powai is an infrastructure project on approximately 9.5 acres of land leased from Larsen & Toubro (L&T) in Tungwa village.
8.52 miles Nxtra Data Mumbai I
Nxtra Mumbai I is located in Airoli, Navi Mumbai and capable of housing 1,100 racks.
8.65 miles Equinix Mumbai MB2
8.67 miles Equinix Mumbai MB3
Equinix’s MB3 is a five-story, 5-acre data center in Mumbai, delivering over 1,370 cabinets at launch and scaling to 5,475 cabinets as part of its interconnected IBX campus, with the facility completed in April 2026
8.72 miles Sify: Mumbai 01 Vashi
Sify’s data center in Vashi, Navi Mumbai, is India’s first commercial data center with 375 rack space.
8.79 miles EverYondr: Mumbai 1
Yondr Group, a global developer, owner-operator and service provider of hyperscale data centres, in a joint venture partnership with the Everstone Group, is investing USD one billion to open data centres across multiple locations in India.
8.79 miles CampusInterested in this information?Contact us
In 2023, Google secured a long-term lease agreement for a substantial data center in Navi Mumbai, spanning 381,000 sq ft (35,400 sqm).
8.90 miles NTT: Chandivali DC8
NTT's Mumbai 8 data center is located in Chandivali area of Mumbai. The facility offers capacity for 2,800 racks.
8.91 miles Nxtra Data Mumbai II
Nxtra Mumbai II is located in Chandivali, Central Mumbai and capable of housing 600 racks.
8.95 miles Equinix Mumbai MB1
8.96 miles NTT Chandivali DC7
8.96 miles Digital Connexion: Mumbai Chandivali
Digital Connexion's BOM10 facility in Chandivali, Mumbai, spans 3,78,205 sq. ft. of space.
8.96 miles Ishan Technologies: Mumbai
8.99 miles NTT Chandivali DC6
9.04 miles NTT: Chandivali DC10
NTT's Mumbai 10 data center is located in Chandivali area of Mumbai.
9.05 miles NTT Chandivali DC5
NTT's Mumbai 5 is located at Chandivali.
9.10 miles Yotta: Chandivali, Mumbai
Yotta Infrastructure is building a new data center park in Chandivali, Mumbai, India. The project comprises two buildings.
9.14 miles NTT: Chandivali DC9
NTT's Mumbai 9 data center is located in Chandivali area of Mumbai. The facility offers capacity for 6,000 racks.
9.19 miles Lumina: Chandivali
Backed by Blackstone, Lumina CloudInfra has acquired a prime four-acre land parcel in Chandivali, Mumbai, for ₹475 crore ($53 million).
10.39 miles STT GDC Palava
ST Telemedia Global Data Centres’ proposed hyperscale campus in Palava City, developed on 46 acres within Lodha Industrial Park. Backed by up to $540M investment, with the initial phase under construction following a March 2026 groundbreaking.
10.50 miles STT Mumbai 2
11.01 miles Bridge Data Centres Mumbai BBY1
11.33 miles Nxtra Data Mumbai
12.00 miles STT Mumbai 3
STT Mumbai DC 3 is the only enterprise grade data Centre within the Financial Hub of the city – Bandra Kurla Complex (BKC), offering proximity to financial institution and BFSI customers
12.89 miles AirTrunk: Raigad DC Campus
The Government of Maharashtra signed a non-binding Letter of Intent with data center operator AirTrunk for a massive 200 billion rupee ($21 billion) deal on June 4, 2026.
16.24 miles STT Mumbai 1
18.07 miles Techno Digital: Mahalaxmi EDC
19.08 miles RackBank: Mumbai
19.59 miles NTT: Balaji IT Park
NTT Global Data Centers has acquired DC-10, an existing 11-storey data center building in Balaji IT Park, Chandivali, Mumbai. The acquisition appears to expand NTT’s footprint around the same Balaji IT Park assets it previously bought from the Kapoor family in 2025.

Carrier-Neutral Data CenterInterested in this information?Contact us Data Center Photos See all

Operating Company

Operated by:
43
Facilities
11
Markets

News See all

Read Digital Edge Plans 270MWV Data Center Campus Near Mumbai
APAC data center provider Digital Edge is reportedly planning a 270MW data center development near Mumbai, India.According to *The Economic Times*, citing a person familiar with the project, the co...

Digital Edge Plans 270MWV Data Center Campus Near Mumbai

July 06, 2026 Digital Edge DC

APAC data center provider Digital Edge is reportedly planning a 270MW data center development near Mumbai, India.According to The Economic Times, citing a person familiar with the project, the company acquired an approximately 30-acre parcel at the proposed Green Integrated Data Centre Park in...

Read more
Read Digital Edge Secures Land in Seoul for New 60MW Data Center
Digital Edge is expanding in South Korea with the acquisition of a powered land parcel in Ansan, near Seoul. Backed by a 90MVA power agreement, the site will host SEL5, a planned 60MW data center. ...

Digital Edge Secures Land in Seoul for New 60MW Data Center

June 08, 2026 Digital Edge DC

Digital Edge is expanding in South Korea with the acquisition of a powered land parcel in Ansan, near Seoul. Backed by a 90MVA power agreement, the site will host SEL5, a planned 60MW data center. The facility will feature dual-feed power from two independent 154kV substations and support...

Read more
Read Digital Edge Reaches Topping-Out Milestone for First Data Center Near Jakarta
Digital Edge Reaches Topping-Out Milestone for First Data Center Near Jakarta

Digital Edge Reaches Topping-Out Milestone for First Data Center Near Jakarta

May 30, 2026 Digital Edge DC

Asia-Pacific data center operator Digital Edge has reached a major construction milestone with the topping out of the first facility at its new campus near Jakarta, Indonesia. The company announced the completion of the structural framework for CGK1, the inaugural building within its CGK Campus...

Read more
Read Digital Edge Raises $575 Million to Expand APAC Data Centers
Digital Edge Raises $575 Million to Expand APAC Data Centers

Digital Edge Raises $575 Million to Expand APAC Data Centers

May 26, 2026 Digital Edge DC

APAC data center firm Digital Edge has secured new debt financing. The company last week announced the successful closing of its inaugural $575 million holding company (HoldCo) financing. Proceeds from the facility will support the continued expansion of the company’s campus footprints across...

Read more
Read PDG Begins Construction on Latest Mumbai Data Center
PDG Begins Construction on Latest Mumbai Data Center

PDG Begins Construction on Latest Mumbai Data Center

April 10, 2026 Mumbai

APAC data center firm Princeton Digital Group (PDG) has begun construction on a new facility in Mumbai, India.“PDG has commenced construction of its MU2 data center campus in Mumbai, following a recent groundbreaking ceremony,” the company announced this week on LinkedIn.PDG acquired the land for...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?