CyrusOne Chandler Phoenix Campus Photos

CyrusOne Chandler Phoenix Campus Data Center Photos


Energy Labs Hybrid Systems utilize a perimeter base frame constructed of Structural Steel to insure minimum deflection
Spartan decor, but functional

Construction Almost Complete in 2013
Source: Bergelectric
First Chandler Facility Under Construction in 2012
Source: Bergelectric
Data Hall
Source: CyrusOne
Energy Labs Hybrid Systems utilize a perimeter base frame constructed of Structural Steel to insure minimum deflection
Energy Labs HVAC Cooling System

Energy Labs Hybrid Systems utilize a perimeter base frame constructed of Structural Steel to insure minimum deflection

Source: CyrusOne
The Architectural Beautiful Entrance to CyrusOne's Chandler Facility
Source: JE Dunn
Elegant Lobby
Source: JE Dunn
Drop Ceiling
Source: JE Dunn
Tech Break Room
Spartan decor, but functional
Lobby for Building #4

Spartan decor, but functional

Building #4 Rooftop Mechanical