Creekstone Energy: Delta Gigasite, Utah

Latest Podcast
Delta
Under Construction
New facility under construction
Operated by:

Creekstone Energy: Delta Gigasite, Utah

Lot Size: 1,143 acres

Creekstone Energy is developing the Delta Gigasite, a hyperscale AI data center campus on 1,143 acres in Millard County, Utah, master-planned for up to 10GW of total capacity. Phase 1 targets 600MW+ of baseload power delivered to customers by end 2027,
drawing from 29 on-site natural gas reciprocating engines providing 300MW+ from H1 2027, supplemented by Torus battery and flywheel storage installed on site in December 2025. The campus operates fully behind the meter via a 345kV private transmission line, with a gas interconnect agreement executed for 43,000 Dth/day of initial capacity supplied via the Kern River Pipeline. Creekstone holds a long-term solar lease on 13,000 acres of Utah state trust land adjacent to the campus, with Millard County zoning approval granted for Phase 1 solar development targeting 1GW+ of generation within 18 months. The facility is carrier-neutral with 100G/400G-ready infrastructure and 20+ long-haul fiber routes intersecting at the site; BluSky AI Inc. is the only confirmed tenant, with up to 50MW allocated across 25 acres.

Map and Nearby Locations:

Delta
Creekstone Energy LLC Sites
Nearby Facilities

Sites within 15 miles of Creekstone Energy: Delta Gigasite, Utah

Distance Site About
0.11 miles BluSky AI: Delta, UT
BluSky AI has signed a letter of intent to acquire 25 acres of land in Utah for a new data center.
7.53 miles Fibernet MercuryDelta Campus
Fibernet MercuryDelta, LLC has successfully requested the rezoning of 1,143.8 acres at approximately 4500 E & HWY 50 Delta, changing its designation from Agriculture 20 (Ag-20) to Heavy Industrial (HI).
15.29 miles Joule HP Compute Campus
The 4,000-acre site, located in Millard County, is projected to have multi gigawatt capacity and launch in 2026.

Creekstone Energy: Delta Gigasite, Utah Data Center Photos (See all)

Operating Company

Operated by:

Creekstone Energy was founded to remove the fundamental limitations on AI growth by solving the energy and scalability challenges. We fuse a Silicon Valley startup vision with enterprise-grade execution, aiming to be the foundational layer for the AI era—where power is plentiful, latency is minimal, and compute can scale without compromise.