Latest Podcast Street AddressInterested in this information?Contact us, Norcross, GA 30071
Operational
Fully operational facility
Operated by:

CleanSpark: Norcross

Year Built: 2021
Utility Provider: Georgia Power
Lot Size: 7 acres
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

An 87,000-square-foot data center in Norcross was purchased and transformed into CleanSpark’s second Bitcoin mining facility. Situated on over seven acres, the immersion-cooled site participates in Georgia’s Flex REC program and is 100% net carbon-neutral.

There are two large rooms that house 20 MW of single-phase immersion — about 4,300 machines. Liquid immersion cooling, where the Bitcoin mining machines are fully immersed in a specialized oil, has proven to significantly improve efficiency by reducing power consumption and extending the life of the machines

Map and Nearby Locations

This Facility
CleanSpark Sites
Nearby Facilities

Station TwoInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of SouthInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Flexential Atlanta-Norcross
The Norcross data center features a cloud node on-site.
NN milesInterested in this information?Contact us Flexential Atlanta-Norcross 2
Flexential plans to expand its Atlanta presence through development of Atlanta – Norcross 2 at 2755 Northwoods Parkway in Norcross, Georgia. The project extends the company’s existing Norcross footprint and is designed to support enterprise and AI workloads with a targeted launch in the first half of 2028.
NN milesInterested in this information?Contact us Equinix Atlanta AT5
Another site Equinix acquired from Verizon.
NN milesInterested in this information?Contact us Lumen Doraville 1
NN milesInterested in this information?Contact us Internap Atlanta: 40 Perimeter Center
In 2017, Internap (NASDAQ:INAP), a global provider of dedicated servers, hybrid cloud, colocation, and managed services, signed a long-term lease for a "Tier 3-like" data center.
NN milesInterested in this information?Contact us 40 Perimeter Center: Lincoln Rackhouse
The data center is 30 minutes from Hartsfield International Airport and 20 minutes from downtown Atlanta.
NN milesInterested in this information?Contact us GI Partners: Alpharetta
This was a former Lincoln Rackhouse facility. In 2025, GI Partners paid $253M for 4905 North Point Parkway, a 185K SF data center, from Lincoln Rackhouse and Principal Asset Management.
NN milesInterested in this information?Contact us Server Farm Atlanta
Server Farm Atlanta at 305 Satellite Blvd was a former AMD data center originally commissioned in 2012 and designed to accommodate approximately 100,000 SF of additional data center space.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Mid-sized bitcoin miner with facilities primarily in Georgia and Mississippi

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Equifax to Decommission Data Center outside Atlanta
Equifax to Decommission Data Center outside Atlanta

Equifax to Decommission Data Center outside Atlanta

September 12, 2025 Atlanta

The City of Alpharetta last week announced that Equifax was investing $25 million to expand its Alpharetta campus, located in Fulton County. The expansion includes the renovation of the third floor of the JV White 1 building, converting it from a data center into collaborative office space. “The...

Read more
Read Atlanta City Council members propose new bill to block data center developments
Atlanta City Council members propose new bill to block data center developments

Atlanta City Council members propose new bill to block data center developments

May 10, 2024 Atlanta

Atlanta City Councilmen Jason Dozier and Matt Westmoreland have introduced bills to block data center developments around certain areas of the Georgia city near transit stops and the Beltline. “Excited to introduce legislation alongside Matt Westmoreland to address the rapid growth of data...

Read more
Read Edged Energy begins work on Atlanta data center
Edged Energy begins work on Atlanta data center

Edged Energy begins work on Atlanta data center

July 04, 2023 Atlanta

Construction on Edge Energy's Atlanta, Georgia data center is underway, with the company commencing work on July 1st. Located at Tilford Yard, the company bought the 158 acre-site back in July 2021; 70 acres will be dedicated to data center development. In January 2023, it filed a building permit...

Read more
Read NCR Resume Additional Services After a Ransomware Breach
NCR Resume Additional Services After a Ransomware Breach

NCR Resume Additional Services After a Ransomware Breach

April 28, 2023 Atlanta

After a ransomware assault caused a data center outage that disrupted its Aloha cloud-based services and Counterpoint apps, NCR is making progress toward restoring services. For the subset of CMC customers who were impacted by the incident, online ordering has resumed and NCR's Command Center...

Read more
Read A new data center is planned for Tilford Yard
A new data center is planned for Tilford Yard

A new data center is planned for Tilford Yard

January 23, 2023 Atlanta

According to reports, a new data center is planned for Tilford Yard, on Atlanta’s Westside, under the project name Edged. This announcement comes following the filing of a building permit for a nearly 210,000-square-foot, two-level data center.Further to this, records show that Endeavour, the...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?