Latest Podcast Street Address
Interested in this information? Contact us
OperationalProspective Expansion
Fully operational facility with prospective expansion planned
Operated by: Canaan Inc.

Canaan: Alborz

Year Built: 2022
░░░░ Request Dataset MW
Total Power

Situated within the Astra Wind Farm in Randall County, Texas, USA, the Alborz Data Center stands as a 40 MW facility dedicated to Bitcoin mining operations.

  • The project was financed by BlockFi Lending LLC through a $46.9 million loan.
  • It is a joint venture between Cipher and Wind HQ. The facility is located at a substation of the 163 MW Astra Wind Farm.

Map and Nearby Locations

This Facility
Canaan Inc. Sites
Nearby Facilities

Canaan: Alborz Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Prime Center Data Center Photos See all

Operating Company

Operated by: Canaan Inc.

Canaan Inc. is a vertically integrated crypto mining company. Founded in 2013, Canaan is best known as a manufacturer of Avalon-branded bitcoin mining hardware (ASICs) and has expanded into operating its own bitcoin mining data centers. In February 2026, Canaan acquired Cipher's 49% stake in the Alborz, Bear, and Chief joint-venture mining sites in West Texas, along with select bitcoin mining equipment from Cipher's Black Pearl facility, in an approximately $40 million all-stock transaction.

3
Facilities
1
Markets
120MW
Megawatts

News See all

Read Bolt Data Partners with TPL to Develop data Center Campuses Across West Texas
Bolt Data Partners with TPL to Develop data Center Campuses Across West Texas

Bolt Data Partners with TPL to Develop data Center Campuses Across West Texas

December 18, 2025 West Texas

Texas Pacific Land Corporation (TPL) has partnered with Bolt Data & Energy to develop data center campuses across TPL-owned land. As part of the deal, Bolt raised $150 million in capital, including $50m from TPL. In return, TPL will receive equity interest, warrants, and a right of first...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?