E11: Building India’s Digital Backbone with Sharad Agarwal
Mar 12, 2026 Eric Bell World
Go to PodcastVianos is a proposed AI data center campus on about 99 hectares of leased land beside the N-322 road, the Torre de Gorgojí and the Guadalmena river in Vianos, Albacete. Blackberry AIF announced it in November 2024 as GDC Vianos and holds it through DC Estate Vianos SL, part of its IberData Hub platform. The design filed for environmental scoping describes two buildings, 60 MW of solar and an on-site gas-fired power plant.
EdgeMode held a stake through a 2026 joint venture with Blackberry AIF, which Blackberry AIF ended in September 2026. Castilla–La Mancha ran preliminary environmental consultations in July and August 2026, and local and environmental groups announced objections. No environmental decision or licence has been published.
| Distance | Site | About |
|---|---|---|
| 4.13 miles | Blackberry AIF: GDC Alcaraz |
AI data center that Blackberry AIF announced in Alcaraz, Albacete, in 2024 before focusing on its neighbouring Vianos campus.
|
Blackberry AIF (BAIF) is a Spanish data center developer based in Seville and led by José Antonio Mora. It develops large AI campuses on leased rural land through one project company per site, under its IberData Hub platform, and plans on-site power from solar, batteries and natural-gas fuel cells. Its projects include sites in Mora (Toledo), Córdoba, Vianos (Albacete), Torrecampo (Córdoba), Cáceres and Tomelloso (Ciudad Real). In 2026 it formed a holding company, Black Artificial Intelligence SL, for its newer project companies.
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to PodcastTell us what you're looking for. We respond within one business day.