Blackberry AIF: Vianos

Latest Podcast Torre de Gorgojí, N-322
In Doubt
The development is facing regulatory or community opposition
Operated by:

Blackberry AIF: Vianos

Site planned for 2029 and has expansions through 2030
Lot Size: 244 acres

Vianos is a proposed AI data center campus on about 99 hectares of leased land beside the N-322 road, the Torre de Gorgojí and the Guadalmena river in Vianos, Albacete. Blackberry AIF announced it in November 2024 as GDC Vianos and holds it through DC Estate Vianos SL, part of its IberData Hub platform. The design filed for environmental scoping describes two buildings, 60 MW of solar and an on-site gas-fired power plant.

EdgeMode held a stake through a 2026 joint venture with Blackberry AIF, which Blackberry AIF ended in September 2026. Castilla–La Mancha ran preliminary environmental consultations in July and August 2026, and local and environmental groups announced objections. No environmental decision or licence has been published.

Site History

  • September 2026: Blackberry AIF ends its joint venture with EdgeMode and takes back the project company.
  • July 2026: Castilla–La Mancha opens preliminary environmental consultations.
  • November 2024: Blackberry AIF announces GDC Vianos, and the land is leased.

Map and Nearby Locations

Torre de Gorgojí, N-322
Blackberry AIF Sites
Nearby Facilities

Blackberry AIF: Vianos Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Blackberry AIF: Vianos

Distance Site
4.13 miles Blackberry AIF: GDC Alcaraz

Operating Company

Operated by:

Blackberry AIF (BAIF) is a Spanish data center developer based in Seville and led by José Antonio Mora. It develops large AI campuses on leased rural land through one project company per site, under its IberData Hub platform, and plans on-site power from solar, batteries and natural-gas fuel cells. Its projects include sites in Mora (Toledo), Córdoba, Vianos (Albacete), Torrecampo (Córdoba), Cáceres and Tomelloso (Ciudad Real). In 2026 it formed a holding company, Black Artificial Intelligence SL, for its newer project companies.

Blackberry AIF History:

  • In September 2026, Blackberry AIF ended its joint venture with EdgeMode and took back the project companies.
  • In January 2026, Blackberry AIF and EdgeMode formed a joint venture over five Spanish campus projects.
  • In July 2025, Blackberry AIF and EdgeMode announced plans to combine.
  • In September 2024, Blackberry AIF announced its first green data center project, GDC Córdoba.
  • Founded in 2024 in Seville.
0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.