Data Center Campus

Virtus: Wustermark Campus (Berlin)

9 sites Berlin
Under ConstructionPlanned
Multi-phase construction project
Operated by:

Campus at a Glance

9 data centers on this campus
First built in 2027 with expansions through 2032
Coordinates: 52.55961, 12.93135
░░░ Request Dataset MW
Operational
░░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

Located just 30 km from Berlin's iconic Brandenburg Gate and a mere 12 km from the city limits, the VIRTUS Wustermark Campus occupies over 350,000 square meters. The Campus consists of 9 data centers.

The site distinguishes itself through innovative sustainable power usage and waste heat recycling. The site is projected to be operational by 2026.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Virtus: Berlin 5 VIRTUS Data Centres Ltd
Under Construction
— — 2027
Virtus: Berlin 6 VIRTUS Data Centres Ltd
Planned
— — 2027
Virtus: Berlin 7 VIRTUS Data Centres Ltd
Planned
— — 2028
Virtus: Berlin 8 VIRTUS Data Centres Ltd
Planned
— — 2029
Virtus: Berlin 10 VIRTUS Data Centres Ltd
Planned
— — 2030
Virtus: Berlin 9 VIRTUS Data Centres Ltd
Planned
— — 2030
Virtus: Berlin 11 VIRTUS Data Centres Ltd
Planned
— — 2031
Virtus: Berlin 12 VIRTUS Data Centres Ltd
Planned
— — 2031
Virtus: Berlin 13 VIRTUS Data Centres Ltd
Planned
— — 2032

Map and Nearby Locations

Virtus: Wustermark Campus (Berlin) Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by:

VIRTUS Data Centres, the one of the UK’s fastest growing data centre provider, owns, designs, builds and operates the country’s most efficient and flexible data centres.

0
Facilities
0
Markets

Documents

Ready to Level up Your
Data Center Strategy?