Data Center Campus

Verne: Mäntsälä DC05 Campus

2 sites Finland
Under ConstructionPlanned
Multi-phase construction project
Operated by:

Campus at a Glance

2 data centers on this campus
First built in 2028 with expansions through 2028
Coordinates: 60.63516, 25.28004
░░░ Request Dataset MW
Operational
░░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

Verne has acquired a 10-hectare site in Mäntsälä, Finland, located a 40-minute drive from Helsinki-Vantaa International Airport, to develop its fifth Nordic data center. The campus, which is expected to be operational in the first half of 2027, will utilize renewable energy and offer its waste heat to the local community.

  • In 2024, Investment firm Ardian completed the acquisition of European data center firm Verne from UK infrastructure firm Digital 9 Infrastructure plc (D9).

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Verne: Mäntsälä DC05 Verne Global
Under ConstructionPlanned
— — 2028
Verne: Mäntsälä DC06 Verne Global
Planned
— — 2028

Map and Nearby Locations

Verne: Mäntsälä DC05 Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

Using 100% renewable energy, Verne Global delivers true high performance computing solutions in an optimised environment.