Data Center Campus

Thorney Lane LLP: Iver Campus

6 sites London: Slough
PlannedLand Bank
Future facility in planning with land secured
Operated by:

Campus at a Glance

6 data centers on this campus
First built in 2028 with expansions through 2035
Coordinates: 51.50901, -0.51303
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░ Request Dataset MW
Planned

The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision. SEGRO (the developer) and Thorney Lane LLP (the landowner) are now moving ahead with a campus that will ultimately feature six data center buildings, doubling the initial three-building proposal. The first phase, which received planning approval in July 2024, consists of three buildings represents a £350 million investment. These structures will reach a maximum height of 25 meters, including rooftop cooling equipment, and are designed to accommodate three floors of data halls.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Thorney Lane LLP: Iver Campus Thorney Lane LLP
Planned
— — 2028
Thorney: Iver DC-B Thorney Lane LLP
Planned
— — 2029
Thorney: Iver DC-C Thorney Lane LLP
Planned
— — 2031
Thorney: Iver DC-D Thorney Lane LLP
Land Bank
— — 2033
Thorney: Iver DC-E Thorney Lane LLP
Land Bank
— — 2034
Thorney: Iver DC-F Thorney Lane LLP
Land Bank
— — 2035

Map and Nearby Locations

Thorney Lane LLP: Iver Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction