Data Center Campus

Kao Data: Harlow Campus

Kao Data's AI-focused colocation campus on London Road in Harlow, Essex, built on the former STC and Nortel research site where fibre optics were pioneered, with a northern extension on Plot F of Harlow Innovation Park. First built in 2018, with expansions planned through 2030.

6 sites London
OperationalUnder ConstructionPlanned
Operational facility with ongoing expansion and future phases planned
Developed by:

Campus at a Glance

6 data centers on this campus
First built in 2018 with expansions through 2030
Total building size: ░░░░░░░ Request Dataset SqFt
Coordinates: 51.77048, 0.13079
░░░░ Request Dataset MW
Operational
░░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

Kao Data's Harlow campus sits on London Road in Harlow, Essex, inside the Harlow Enterprise Zone on the London-Stansted-Cambridge corridor, about five minutes from M11 Junction 7.

Land and planning

  • The original 15-acre campus occupies part of Kao Park, the former Standard Telephones and Cables (later Nortel Networks) research laboratories where Charles Kao pioneered fibre optic communication in 1966.
  • Four buildings are consented under the London Road South Local Development Order.
  • In March 2025 Kao, through its subsidiary KD 6 Ltd, filed an LDO compliance application (HW/LDOC/25/00366) to extend the campus north onto Plot F of Harlow Innovation Park. The plot covers about 4 ha. Landowner Powerrapid Ltd had already confirmed data centre use there in 2023 (HW/LDOC/23/00271). The plans add two buildings plus a substation with ancillary offices.

Ownership
Kao Data is backed by Infratil (majority holder since its 2021 investment), Legal & General Capital and Goldacre (Noé Group).

Shared infrastructure

  • UK Power Networks supplies 43.5 MVA over three 33 kV circuits, laid along a 5.1 km route to an on-campus 33 kV primary substation.
  • Power is distributed at 11 kV, with dual feeds to each building and N+1 11 kV generators running on hydrotreated vegetable oil.
  • The Plot F masterplan adds a new substation and two new HV supplies.
  • Downing Renewable Developments is building a 40 MW solar farm that will supply the campus by private wire under a long-term PPA. Grid electricity is 100% renewable, backed by REGOs.

Customers and milestones

  • Customers include Ori, which opened its first UK cloud region here, plus 20i, Arm and Nebius, which signed a 10-year capacity agreement in June 2026.
  • ServerChoice and Kyndryl run colocation inside the first building.
  • Kao also partners with Jisc to give UK academia access to the campus.
  • The first building was the first OCP Ready data centre in the UK. It also holds the Uptime Institute Management and Operations Stamp of Approval (2021).
  • All buildings are designed to BREEAM Excellent and NVIDIA DGX-Ready standards.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Kao Data: KLON-01 KAO Data
Operational
░░░ Request Dataset MW ░░░░░░ Request Dataset SqFt 2018
Kao Data: KLON-02 KAO Data
Operational
░░░ Request Dataset MW ░░░░░░ Request Dataset SqFt 2023
Kao Data: KLON-03 KAO Data
Under Construction
— — 2027
Kao Data: KLON-04 KAO Data
Planned
— — 2029
Kao Data: KLON-07 KAO Data
Planned
— — 2030
Kao Data: KLON-08 KAO Data
Planned
— — 2030

Map and Nearby Locations

Kao Data: Harlow Campus Power Growth Over Time

+100% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Developer

Developed by:

Kao Data Campus provides state-of-the-art, carrier-neutral data centre space in the London area. Whether you need a single rack, a Technology Cell for high density computing or an entire Technology Suite, Kao offers a highly flexible, secure and location-critical facility within easy reach of central London and the City.

With ultra-low PUE (<1.2 at partial load), Kao Data Campus has been engineered for concurrent maintainability with low component count, the facility provides the assurance of high efficiency and high reliability IT services with the very highest levels of data centre uptime.

Kao’s on-demand resources offer performance lead capabilities to customers from a variety of data driven industries, from banking, media and gaming to R&D and retail. Kao Data Campus offers every customer a bespoke data centre solution for their individual requirements.

0
Facilities
0
Markets

News

Read Nvidia pledges over $100m for UK supercomputer as talks on its Arm acquisition reach regulators
Nvidia pledges over $100m for UK supercomputer as talks on its Arm acquisition reach regulators

Nvidia pledges over $100m for UK supercomputer as talks on its Arm acquisition reach regulators

June 22, 2021 Kao Data: KLON-01

Nvidia has announced that it is funneling over $100 million into its Cambridge-1 supercomputer, based at the Kao Data Campus in Harlow. This is $45 million more than its original pledge. This announcement came as the GPU company revealed their acquisition of Arm for $40 billion, which the company...

Read more
Read Kao Data deploys 100% renewable energy at London One campus
Kao Data deploys 100% renewable energy at London One campus

Kao Data deploys 100% renewable energy at London One campus

June 05, 2019 Kao Data: KLON-01

June 5th, 2019, London, United Kingdom, Kao Data, the home of innovation and UK’s leading entrant to the wholesale colocation data centre market, has announced it will operate using 100 percent renewable energy and be cost neutral to its customers. When the campus is operating at full load...

Read more
Read More News