Data Center Campus

Drax: Selby Campus

2 sites Leeds
Planned
Future facility in planning stage
Developed by:

Campus at a Glance

2 data centers on this campus
First built in 2027 with expansions through 2027
Coordinates: 53.73649, -0.99652
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░░░░ Request Dataset MW
Planned

Drax Group is set to transform its historic Selby Power Station in North Yorkshire into a massive digital infrastructure hub, leveraging legacy infrastructure to meet the booming power demands of artificial intelligence. The company is currently preparing a planning application for an initial phase that could be operational as early as 2027, with long-term ambitions to expand the site to over 1 gigawatt (GW).

By repurposing the land, cooling systems, and high-voltage grid connections from its former coal-fired operations, Drax can bypass the years-long queues for new electricity connections that typically stall such projects. This pivot is a cornerstone of Drax’s strategy to reinvest up to £2 billion into growth projects through 2031, positioning the energy giant as a key "infrastructure partner" for global tech developers seeking reliable, large-scale power in the UK.

The proposed data center will initially use the national grid, with the potential to switch to Drax’s on-site power in later phases, pending regulatory approval.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Drax: Selby 1 Drax Group
Planned
— — 2027
Drax: Selby Expansion Drax Group
Planned
— — —

Map and Nearby Locations

Drax: Selby Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Developer

Developed by:

Drax Group is a renewable energy company engaged in renewable power generation, the production of sustainable biomass and the sale of renewable electricity to businesses.

Drax operates a generation portfolio of sustainable biomass, hydro-electric and pumped hydro storage assets across four sites in England and Scotland. It is the UK’s largest source of renewable electricity. The company also operates a global bioenergy supply business with manufacturing facilities at 13 sites in the United States and Canada, producing compressed wood pellets for its own use and for customers in Europe and Asia.

The Group employs 3,400 people in the UK and North America.

Enabling a zero carbon, lower cost energy future is Drax Group’s purpose and in 2019, it announced a world-leading ambition to be carbon negative by 2030, using Bioenergy with Carbon Capture and Storage (BECCS) technology to remove carbon dioxide (CO2) from the atmosphere at scale whilst delivering reliable renewable electricity.

0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?