Published in United States

Talen Energy Acquires Two Gas Plants within PJM Market

Jul 30, 2025 | Posted by Abdul-Rahman Oladimeji

US Independent Power Producer Talen Energy has made two major power generation acquisitions in Ohio and Pennsylvania to support its capacity to power the data center sector.

The company acquired the 1.058GW Moxie Freedom Project located in Salem Township, Pennsylvania, from Caithness Energy, and the 1.875GW Guernsey County Power Station in Ohio from Caithness and BlackRock for a total of $3.5 billion.

“This acquisition enhances Talen’s fleet by selectively adding modern, highly efficient baseload H-class CCGTs in Talen’s key markets, where we are an innovator in data center contracting,” said Mac McFarland, Talen president and chief executive officer.

"The transaction is immediately and highly accretive, maintains our balance sheet discipline, and adds more than the equivalent of another Susquehanna nuclear plant to our platform, further enabling large load service.”


There are 4636 data centers in United States.

Tentative site plan for Zydeco Development's data center in Hutto, Texas
Posted in Zydeco Development: Hutto, Texas Source: Zydeco
Proposed site for IND A1 data center in Indianapolis
Posted in Metrobloks: Indianapolis A1 Source: Metrobloks
Posted in DataBank: Los Angeles |
Posted in Edged: Phoenix |
The Autophone of Laredo data center in Texas (Image 5)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center Texas (Image 4)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center Texas (Image 3)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center in Texas (Image 2)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center in Texas (Image 1)
Posted in Autophone: Laredo Source: Autophone of Laredo
Posted in Google: Project Cannoli |
Site Aerial Map
Posted in Grandilla: Phoenix, Arizona Source: https://mccobagenda.databankcloud.com/AgendaOnline/Documents/DownloadFileBytes/02.03%20CPA250009%20Z250027%20BOS%20REPORT.PDF.pdf?documentType=1&meetingId=4622&itemId=264342&publishId=145477&isSection=False&isAttachment=True
Meta: Project Domino
Posted in Meta: Project Domino Source: https://www.datacenterdynamics.com/en/news/meta-announces-1gw-data-center-campus-in-indiana/
Sequitor Edge Data Center
Posted in Sequitor Edge: Rapid City, South Dakota Source: https://sequitoredge.com/news/sequitor-edge-data-center-coming-to-rapid-city/
Proposed site for Wildwood Ranch AI Campus in Joplin, Missouri
Posted in Wildwood Ranch: Joplin, MO Source: Joplin City Council
Proposed site for Takanock's Project Baccara in Arizona
Posted in Takanock: Project Baccara Source: Takanock
Proposed sitemap for Project Laurel in Limerick Township
Posted in Project Laurel Source: Limerick Township | MCD 7 LLC
Proposed site plan for Project Flex in Lyon Township, Michigan
Posted in Verrus: Project Flex Source: Verrus
Proposed siteplan for Project Delta in Stokes County
Posted in Project Delta Source: Project Delta
EdgeConneX acquired a 180-acre parcel near AUS01 in Bastrop, Texas.
Posted in EdgeConneX: Austin AUS01 Source: Bastrop CAD
Preliminary siteplan for Cloverleaf's data center in St. Louis, Missouri
Posted in Cloverleaf: Troy Campus Source: Cloverleaf Infrastructure
Proposed site for Morris Technology Park
Posted in Tract: Morris Tech Park Source: Tract
Proposed layouts of the Janesville data center
Posted in APECS Data Center Campus Source: Planning documents
Site for QumulusAI's data center in Denton, TX
Posted in QumulusAI: Denton, TX |
Hut 8 launched Project Vega in Texas
Posted in Hut 8: Project Vega Source: Hut 8
Blueprint for Energy Storage Solution’s proposed Kingsboro AI Data Center
Posted in Kingsboro AI data center Source: Energy Storage Solutions LLC
Rendering of Beale Infrastructure's Project Atlas in Oklahoma
Posted in Beale: Project Atlas Source: Beale Infrastructure

Ready to Level up Your
Data Center Strategy?