Published in United States

Hyper Bit to Acquire Dogecoin Mining

May 27, 2025 | Posted by Abdul-Rahman Oladimeji

Cryptomining firm Hyper Bit Technologies this week announced it has signed a non-binding agreement to purchase Dogecoin Mining Technologies in a structured deal that will include an 11MW data center hosting facility based in Canada, along with a minimum of 2,000 ElphaPex DG2 mining rigs.

“We view Dogecoin and Litecoin as uniquely compelling assets, offering robust mining economics and significant upside potential, particularly due to their strong correlation with Bitcoin price trends,” said Hyper Bit COO, Cole Goodwin.

“We are excited to partner with the Dogecoin Mining Technologies team, whose extensive expertise and industry connections are anticipated to add substantial strategic value to Hyper Bit,” Goodwin added.


“We are excited by the opportunity to merge our efforts with the team at Hyper Bit, who shares our focus on Dogecoin's strong economic potential in today's competitive landscape,” said Dogecoin Mining president, Carl Hermansen, adding: “Pending capital allocation, our platform is ready for immediate launch and scalable growth."

There are 4636 data centers in United States.

Tentative site plan for Zydeco Development's data center in Hutto, Texas
Posted in Zydeco Development: Hutto, Texas Source: Zydeco
Proposed site for IND A1 data center in Indianapolis
Posted in Metrobloks: Indianapolis A1 Source: Metrobloks
Posted in DataBank: Los Angeles |
Posted in Edged: Phoenix |
The Autophone of Laredo data center in Texas (Image 5)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center Texas (Image 4)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center Texas (Image 3)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center in Texas (Image 2)
Posted in Autophone: Laredo Source: Autophone of Laredo
The Autophone of Laredo data center in Texas (Image 1)
Posted in Autophone: Laredo Source: Autophone of Laredo
Posted in Google: Project Cannoli |
Site Aerial Map
Posted in Grandilla: Phoenix, Arizona Source: https://mccobagenda.databankcloud.com/AgendaOnline/Documents/DownloadFileBytes/02.03%20CPA250009%20Z250027%20BOS%20REPORT.PDF.pdf?documentType=1&meetingId=4622&itemId=264342&publishId=145477&isSection=False&isAttachment=True
Meta: Project Domino
Posted in Meta: Project Domino Source: https://www.datacenterdynamics.com/en/news/meta-announces-1gw-data-center-campus-in-indiana/
Sequitor Edge Data Center
Posted in Sequitor Edge: Rapid City, South Dakota Source: https://sequitoredge.com/news/sequitor-edge-data-center-coming-to-rapid-city/
Proposed site for Wildwood Ranch AI Campus in Joplin, Missouri
Posted in Wildwood Ranch: Joplin, MO Source: Joplin City Council
Proposed site for Takanock's Project Baccara in Arizona
Posted in Takanock: Project Baccara Source: Takanock
Proposed sitemap for Project Laurel in Limerick Township
Posted in Project Laurel Source: Limerick Township | MCD 7 LLC
Proposed site plan for Project Flex in Lyon Township, Michigan
Posted in Verrus: Project Flex Source: Verrus
Proposed siteplan for Project Delta in Stokes County
Posted in Project Delta Source: Project Delta
EdgeConneX acquired a 180-acre parcel near AUS01 in Bastrop, Texas.
Posted in EdgeConneX: Austin AUS01 Source: Bastrop CAD
Preliminary siteplan for Cloverleaf's data center in St. Louis, Missouri
Posted in Cloverleaf: Troy Campus Source: Cloverleaf Infrastructure
Proposed site for Morris Technology Park
Posted in Tract: Morris Tech Park Source: Tract
Proposed layouts of the Janesville data center
Posted in APECS Data Center Campus Source: Planning documents
Site for QumulusAI's data center in Denton, TX
Posted in QumulusAI: Denton, TX |
Hut 8 launched Project Vega in Texas
Posted in Hut 8: Project Vega Source: Hut 8
Blueprint for Energy Storage Solution’s proposed Kingsboro AI Data Center
Posted in Kingsboro AI data center Source: Energy Storage Solutions LLC
Rendering of Beale Infrastructure's Project Atlas in Oklahoma
Posted in Beale: Project Atlas Source: Beale Infrastructure

Ready to Level up Your
Data Center Strategy?